Spatio-temporal optimization of construction elevator planning in high-rise building projects

被引:1
|
作者
Wu, Keyi [1 ]
de Soto, Borja Garcia [1 ]
机构
[1] New York Univ Abu Dhabi, Div Engn, SMART Construct Res Grp, Abu Dhabi, U Arab Emirates
来源
关键词
Construction hoist; Temporary elevator; Vertical transportation; Mixed-integer programming; TRANSPORTATION; SIMULATION; HOIST; TIME;
D O I
10.1016/j.dibe.2024.100328
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Appropriate construction elevator planning is beneficial for successfully completing high-rise building projects. Construction elevator planning typically remains unchanged throughout a high-rise building project or seldom involves the designation of service days, which causes such planning not to respond effectively to variable transportation demands and adversely affects the possibility of further optimization. Another limitation is that the installation and dismantlement dates of construction elevators, which are highly important when multiple construction elevators are used, cannot be explicitly determined in construction elevator planning. To solve these weaknesses, this paper proposes an approach to assign construction elevator cabs to serve designated days and floors based on actual transportation demands from the perspective of spatio-temporal optimization with mixedinteger programming. The experimental case study results show that the presented planning can significantly reduce the total cost when compared to other planning and can provide evidence and explanation for determining the installation and dismantlement dates of construction elevators.
引用
收藏
页数:25
相关论文
共 50 条
  • [41] A Brief Analysis on the Steel Structure Construction of High-rise Building
    Cai, Zhiwei
    PROCEEDINGS OF THE 2016 6TH INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS, ENVIRONMENT, BIOTECHNOLOGY AND COMPUTER (MMEBC), 2016, 88 : 192 - 196
  • [42] Influence of shrinkage and creep on high-rise building in construction process
    Deng, Zhi-Heng
    Qin, Rong
    Harbin Jianzhu Daxue Xuebao/Journal of Harbin University of Civil Engineering and Architecture, 2002, 35 (05): : 28 - 31
  • [43] Two fast strategies for high-rise building construction simulation
    LTCS, Department of Mechanics and Engineering Science, Peking University, Beijing 100871, China
    Gongcheng Lixue, 2006, 7 (87-92):
  • [44] Steel and composite structural shells in the construction of high-rise building
    Redkin, Andrey
    Baranovskii, Mikhail
    Tarasov, Vladimir
    INTERNATIONAL SCIENTIFIC CONFERENCE WEEK OF SCIENCE IN SPBPU - CIVIL ENGINEERING (SPBWOSCE-2015), 2016, 53
  • [45] Research on transfer floor technology in high-rise building construction
    Zhang, Peng
    2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
  • [46] Study on Ventilation in High-Rise Building Based on Pressure Differences Measured at Elevator Doors
    Shinomiya, Naoto
    Takada, Satoru
    Ushio, Tomoaki
    6TH INTERNATIONAL BUILDING PHYSICS CONFERENCE (IBPC 2015), 2015, 78 : 2712 - 2716
  • [47] ALTERNATIVE METHODS FOR GEODETIC PROVISION OF HIGH-RISE BUILDING CONSTRUCTION
    Nesterenok, M. S.
    SCIENCE & TECHNIQUE, 2009, (06): : 5 - 6
  • [48] Construction Management Solutions to Mitigate Elevator Noise and Vibration of High-Rise Residential Buildings
    Oh, Yangki
    Kang, Minwoo
    Lee, Kwangchae
    Kim, Sunkuk
    SUSTAINABILITY, 2020, 12 (21) : 1 - 21
  • [49] Design and construction of high-rise modular buildings based on recent projects
    Hough, Michael J.
    Lawson, R. Mark
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (06) : 37 - 44
  • [50] Tornado-induced vibration assessment of construction elevator attached to high-rise buildings
    He, Zheng
    Gao, Maoxing
    Liang, Tian
    Lai, Xiao
    Lu, Yi
    Pan, Feng
    STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 2024, 33 (13):