Seismic Behavior of Precast Bridge Column-Cap Beam Joints with Grouted Corrugated Duct Connections: Experimental and Numerical Study

被引:5
|
作者
Xu, Yazhou [1 ]
Wei, Kelun [2 ]
Zhang, Zuzhen [1 ]
Wang, Jiangbo [1 ]
Mao, Huinan [1 ]
Fu, Wenjie [1 ]
机构
[1] Xian Univ Architecture & Technol, Sch Civil Engn, Xian 710055, Shaanxi, Peoples R China
[2] Xian Univ Architecture & Technol, Sch Civil Engn, 13,Yanta Rd, Xian 710055, Shaanxi, Peoples R China
关键词
Grouted corrugated ducts; Numerical simulation; Precast bridge column-cap beam joints; Pseudostatic cyclic loading test; Seismic performance; PERFORMANCE; CONSTRUCTION;
D O I
10.1061/JBENF2.BEENG-5780
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presented an assembly scheme that was based on bundled bars-grouted corrugated duct connections. The scheme was used for the connection between the bridge column with bundled bars and the cap beam in an elevated subway station. Two 1/3-scale bridge column-cap beam joint specimens were designed and fabricated to verify the scheme. The test specimens included a precast assembly specimen and a cast-in-place (CIP) specimen. Pseudostatic cyclic loading tests were performed to investigate the flexural capacity, failure mode, and hysteretic behavior of the CIP and precast assembly specimens. The test results showed that: (1) the flexural capacity of the precast assembly specimen was close to that of the CIP specimen; (2) the energy dissipation capacity of the precast assembly specimen was weaker compared with that of the CIP specimen; and (3) the assembly scheme that was based on bundled bars-grouted corrugated duct connections was reliable. Finally, the finite-element model for the test specimens was established by calling the PQ-FIBER user subroutine developed by Tsinghua University with ABAQUS to study the seismic performance of the test specimens. Compared with the test results, the finite-element models could simulate the failure mode and hysteretic behavior of the reinforced-concrete specimens.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Experimental study on effect of length of service hole on seismic behavior of exterior precast beam-column connections
    Liu, Yangqing
    Cai, Jianguo
    Deng, Xiaowei
    Cao, Yunfeng
    Feng, Jian
    STRUCTURAL CONCRETE, 2019, 20 (01) : 85 - 96
  • [32] Development and Seismic Behavior of Precast Concrete Beam-to-Column Connections
    Guan, Dongzhi
    Jiang, Cheng
    Guo, Zhengxing
    Ge, Hanbin
    JOURNAL OF EARTHQUAKE ENGINEERING, 2018, 22 (02) : 234 - 256
  • [33] Experimental study on seismic behavior of concrete-filled precast concrete tube column to steel beam connections
    Zhang S.
    Zhang X.
    Zhang T.
    Li X.
    Ding Y.
    Jia L.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2022, 43 (07): : 143 - 155
  • [34] Experimental and Numerical Study on the Seismic Performances of Reinforcement-Embedded RC Column-to-Precast Cap Beams with Socket Connections
    Peng, Wenqiang
    Lu, Wenliang
    Liu, Sitian
    Liu, Yong
    Xu, Linfeng
    Li, Fenglin
    BUILDINGS, 2023, 13 (09)
  • [35] Experimental study on lateral behavior of precast wide beam-column joints
    Kim, Jae Hyun
    Jang, Beom Soo
    Choi, Seung-Ho
    Lee, Yoon Jung
    Jeong, Ho Seong
    Kim, Kang Su
    EARTHQUAKES AND STRUCTURES, 2021, 21 (06) : 653 - 667
  • [36] Numerical Simulation Study on the Seismic Performance of Prefabricated Fiber-Reinforced Concrete Beam-Column Joints With Grouted Sleeve Connections
    Zhuang, Mei-Ling
    Cheng, Jinsheng
    Fei, Dongsong
    Sun, Chuanzhi
    Wang, Zhenbo
    Chen, Baodong
    Qiao, Yan
    INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS, 2024, 18 (01)
  • [37] Experimental study on seismic behaviour of precast recycled fine aggregate concrete beam-column joints with pressed sleeve connections
    Yuan, Chang-Min
    Cai, Jian
    Chen, Qing-Jun
    Liu, Xinpei
    Huang, Houjun
    Zuo, Zhiliang
    He, An
    JOURNAL OF BUILDING ENGINEERING, 2022, 58
  • [38] EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF A NEW PRECAST CONCRETE BEAM TO COLUMN CONNECTION
    Yu, Jianbing
    Guo, Zhengxing
    Guan, Dongzhi
    PROCEEDINGS OF THE THIRTEENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS 1 AND II, 2014, : 1305 - 1312
  • [39] Seismic performance of the precast segmental hollow section bridge columns with UHPC wet joint connections and UHPC grouted duct connections
    Zhu, Guoqiang
    Zhou, Mi
    Song, Jianwei
    Tian, Xingwang
    STRUCTURES, 2025, 71
  • [40] Experimental study on seismic performance of precast bridge pier with grouted splice sleeve
    College of Civil Engineering, Tongji University, Shanghai
    200092, China
    Tongji Daxue Xuebao, 7 (1010-1016):