Exploring optimal joint operating rules for large-scale inter-basin water transfer projects with multiple water sources, diversion routes, and water demand areas

被引:7
|
作者
Zhong, Huayu [1 ]
Liao, Tao [2 ]
Fang, Guohua [1 ]
Ren, Kang [3 ]
Zhang, Shiwei [1 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Peoples R China
[2] Jiangsu Prov Water Conservancy Survey & Design Ins, Yangzhou 225000, Peoples R China
[3] China Three Gorges Univ, Coll Hydraul & Environm Engn, Yichang 443002, Peoples R China
关键词
Inter-basin water transfer; Jiangsu Province section of the South-to-North; Water Diversion Project; Optimized operation; Simulation-optimization approach; Water resources allocation; CLIMATE-CHANGE; SHORTAGES; MODEL; STRESS; POLICY; RIVER;
D O I
10.1016/j.ejrh.2023.101504
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Study region: The Jiangsu Province section of the South-to-North Water Diversion Project (JSSNWDP) is an essential section of the SNWDP, which includes multiple water sources, diversion routes, and water demand areas. Study focus: Exploring effective operating rules for the JSSNWDP is critical to improving its long-term operational performance. However, deriving the operating rule for the JS-SNWDP remains a pressing challenge due to the complexity of its water allocation, which requires trade-offs between multiple water sources and diversion routes when supplying and transferring water. Here, we design a new form of the joint operating rules for the JS-SNWDP that includes water-supply rules and water-transfer rules, and establish a multiobjective optimization operation model by simulation-optimization approach to identify the optimal joint operating rules that contribute to the improvement of water supply reliability and the reduction of operation cost. New hydrological insights for the region: The proposed joint operating rule shows obvious advantages over the regular operating rule, with an increase in the water supply rate (2.0%) while the strongly reduced pumping water (24.7%). Meanwhile, compared with the regular operating rule, the joint operating rule enables a more rational use of the runoff regulation capacity of the lakes, which obviously reducing the pumping water from the Yangtze River and the surplus water in the two lakes obviously. The findings of this study are applicable to improve the operational performance of the JS-SNWDP, and provide a reference for exploring the joint operating rules for other IBWTPs with similar structures.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Optimization Operation Model Coupled with Improving Water-Transfer Rules and Hedging Rules for Inter-Basin Water Transfer-Supply Systems
    Yong Peng
    Jinggang Chu
    Anbang Peng
    Huicheng Zhou
    Water Resources Management, 2015, 29 : 3787 - 3806
  • [32] Analysis of Asynchronism-Synchronism of Regional Precipitation in Inter-Basin Water Transfer Areas
    张强
    王本德
    李慧赟
    TransactionsofTianjinUniversity, 2012, 18 (05) : 384 - 392
  • [33] Multi-Objective Optimal Scheduling of Generalized Water Resources Based on an Inter-Basin Water Transfer Project
    Xi, Haichao
    Xie, Yangyang
    Liu, Saiyan
    Mao, Qing
    Shen, Teng
    Zhang, Qin
    WATER, 2023, 15 (18)
  • [34] Analysis of asynchronism-synchronism of regional precipitation in inter-basin water transfer areas
    Qiang Zhang
    Bende Wang
    Huiyun Li
    Transactions of Tianjin University, 2012, 18 (5) : 384 - 392
  • [35] Modelling water quality and quantity with the influence of inter-basin water diversion projects and cascade reservoirs in the Middle-lower Hanjiang River
    Wang, Yonggui
    Zhang, Wanshun
    Zhao, Yanxin
    Peng, Hong
    Shi, Yingyuan
    JOURNAL OF HYDROLOGY, 2016, 541 : 1348 - 1362
  • [36] Multi-objective optimal water supply scheduling model for an inter-basin water transfer system: the South-to-North Water Diversion Middle Route Project, China
    Ouyang, Shuo
    Qin, Hui
    Shao, Jun
    Lu, Jiantao
    Bing, Jianping
    Wang, Xuemin
    Zhang, Rui
    WATER SUPPLY, 2020, 20 (02) : 550 - 564
  • [37] Impact of Inter-Basin Water Transfer Projects on Regional Ecological Security from a Telecoupling Perspective
    Quan, Yuan
    Wang, Chenxing
    Yan, Yan
    Wu, Gang
    Zhang, Hongxun
    SUSTAINABILITY, 2016, 8 (02)
  • [38] Study on coupling of optimal water transfer and supply process for inter-basin water-transfer multi-reservoir system
    Guo X.
    Lei X.
    Li Y.
    Li J.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2016, 47 (07): : 949 - 958
  • [39] Multi-reservoir operating rule in inter-basin water transfer-supply project
    Guo, Xu-Ning
    Hu, Tie-Song
    Lu, Yi-Bing
    Zhang, Tao
    Shuili Xuebao/Journal of Hydraulic Engineering, 2012, 43 (07): : 757 - 766
  • [40] Research on reservoir operation rules of inter-basin water transfer based on decision tree method
    Xi, Shu-Feng
    Peng, Yong
    Liang, Guo-Hua
    Wang, Ben-De
    Xie, Zhi-Gao
    Li, Xue-Sen
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2012, 52 (01): : 74 - 78