Risk-based Optimal Bidding and Operational Scheduling of a Virtual Power Plant Considering Battery Degradation Cost and Emission

被引:0
|
作者
Akkas, Ozge Pinar [1 ]
Cam, Ertugrul [2 ]
机构
[1] Kirikkale Univ, Dept Elect Elect Engn, TR-71450 Kirikkale, Turkiye
[2] Samsun Univ, Dept Elect Elect Engn, TR-55070 Samsun, Turkiye
关键词
distributed power generation; energy management; power system planning; renewable energy sources; risk analysis; ECONOMIC-DISPATCH; ENERGY; OPTIMIZATION; STRATEGY; HEAT;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A virtual power plant (VPP) is a system combining various types of distributed energy resources (DERs) to provide a reliable power system operation. It provides the advantage of making changes in generation according to variety, price, and demand conditions with bringing renewable energy sources (RES) in a single portfolio and using their flexibility. In this study, it is tried to find optimal bidding and operational scheduling of a VPP containing Wind Power Plant (WPP), Photovoltaic Power Plant (PVPP), Heat-Only Unit (HOU), Battery Energy Storage System (BESS), Combined Heat and Power Plant (CHPP), and electrical/thermal demands and participating in the day-ahead electricity market in 24-h time interval. It is aimed to maximize profit and minimize emissions with considering the battery cost. A stochastic model is formed by considering the uncertainty arising from RES. In addition, CVaR (Conditional Value at Risk) as a risk measurement technique is applied against the risk arising from low profit scenarios. The proposed optimization problem formulated as a stochastic Mixed Integer Nonlinear Programming (MINLP) model and is solved by solver LINDO in GAMS (General Algebraic Modelling System). The case studies are implemented to show the applicability and effectiveness of the presented model.
引用
收藏
页码:19 / 28
页数:10
相关论文
共 50 条
  • [41] Low-carbon economic scheduling of virtual power plant considering carbon emission flow and demand response
    Wang, Yongchao
    Xu, Jiantie
    Pei, Wenhui
    Wang, Hanyang
    Zhang, Zhuang
    FRONTIERS IN ENERGY RESEARCH, 2024, 12
  • [42] Multi-time Scale Simulation of Optimal Scheduling Strategy for Virtual Power Plant Considering Load Response
    Chao, Huang
    Quan, Ding
    Yang, Tong
    2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 2142 - 2148
  • [43] Two-stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
    Zhang, Xiaohui
    Liu, Yufei
    ENGINEERING REPORTS, 2024, 6 (12)
  • [44] Optimal day-ahead scheduling of renewable energy-based virtual power plant considering electrical, thermal and cooling energy
    Basu, Mousumi
    JOURNAL OF ENERGY STORAGE, 2023, 65
  • [45] Optimal scheduling of virtual power plant considering demand side response based on mixed integer second-order cone programming
    Liu L.
    Luo N.
    Wu T.
    Zheng W.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2021, 42 (08): : 96 - 104
  • [46] Optimal Energy Management for Virtual Power Plant Considering Operation and Degradation Costs of Energy Storage System and Generators
    Borisoot, Kanjanapon
    Liemthong, Rittichai
    Srithapon, Chitchai
    Chatthaworn, Rongrit
    ENERGIES, 2023, 16 (06)
  • [47] Research on Optimal Operation Model of Virtual Electric Power Plant Considering Net-Zero Carbon Emission
    Wu, Yungao
    Wu, Jing
    De, Gejirifu
    Fan, Wei
    SUSTAINABILITY, 2022, 14 (06)
  • [48] Risk-Based Electrical-Thermal Scheduling of a Large-Scale Virtual Power Plant Using Downside Risk Constraints for Participating in Energy and Reserve Markets
    Shahkoomahalli, Amirali
    Koochaki, Amangaldi
    Shayanfar, Heidarali
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (03) : 2663 - 2683
  • [49] Cost- and Risk-Based Seismic Design Optimization of Nuclear Power Plant Safety Systems
    Bolisetti, Chandrakanth
    Coleman, Justin
    Hoffman, William
    Whittaker, Andrew
    NUCLEAR TECHNOLOGY, 2021, 207 (11) : 1687 - 1711
  • [50] Risk-Based Electrical-Thermal Scheduling of a Large-Scale Virtual Power Plant Using Downside Risk Constraints for Participating in Energy and Reserve Markets
    Amirali Shahkoomahalli
    Amangaldi Koochaki
    Heidarali Shayanfar
    Arabian Journal for Science and Engineering, 2022, 47 : 2663 - 2683