共 50 条
- [31] Availability-Based Reliability-Centered Maintenance Scheduling: Case Study of Domestic (Building-Integrated) Hot Water Systems ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2018, 4 (01):
- [32] Application of Mining Width-Constrained Open Pit Mine Production Scheduling Problem to the Medium-Term Planning of Radomiro Tomic Mine: A Case Study Mining, Metallurgy & Exploration, 2024, 41 : 681 - 693
- [37] Effects of acid mine drainage on groundwater quality: a case study from an open-pit copper mine in eastern Turkey Bulletin of Engineering Geology and the Environment, 2013, 72 : 485 - 493
- [39] Digital Twin Architecture for Mining Industry: Case Study of a Stacker Machine in an Experimental Open-Pit Mine 2022 IEEE 4TH GLOBAL POWER, ENERGY AND COMMUNICATION CONFERENCE (IEEE GPECOM2022), 2022, : 232 - 237
- [40] Application of ARENA Simulation Software for Evaluation of Open Pit Mining Transportation Systems - A Case Study PROCEEDINGS OF THE 12TH INTERNATIONAL SYMPOSIUM CONTINUOUS SURFACE MINING - AACHEN 2014, 2015, : 213 - 224