共 50 条
- [11] Application of logistic cycle model to determine high water co ntent reservoir reasonable injection-production ratio 2018 2ND INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2018), 2018, 153
- [12] Derivation of water flooding characteristic curve for high water-cut oilfields Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2013, 40 (02): : 201 - 208
- [14] Optimization for Production and Operation Plan of Oilfield Gathering and Transportation System at High Water-cut Stage SYSTEMS, ORGANIZATIONS AND MANAGEMENT: PROCEEDINGS OF THE 3RD WORKSHOP OF INTERNATIONAL SOCIETY IN SCIENTIFIC INVENTIONS, 2009, : 6 - 12
- [15] Optimization of Automatic Well Pattern Deployment in High Water-Cut Oilfield JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2023, 145 (11):
- [18] Fuzzy Comprehensive Evaluation for Injection-Production Effectiveness in Medium-High Water Cut Stage 2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
- [19] The Simulation Study of Multicycle Injection-production of the Underground Gas Storage in the High Water Cut Reservoir PROCEEDINGS OF THE AASRI INTERNATIONAL CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (IEA 2015), 2015, 2 : 376 - 379
- [20] The Research on the Injection Interval's Reasonable Water Injection Rate for Multi-Layer Sandstone Oilfield at Ultra-High Water Cut Stage PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON ADVANCED DESIGN AND MANUFACTURING ENGINEERING, 2015, 39 : 583 - 588