Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

被引:0
|
作者
Wangming Li [1 ]
Dong Han [1 ]
Liang Gao [1 ]
Xinyu Li [1 ]
Yang Li [1 ]
机构
[1] The State Key Laboratory of Digital Manufacturing Equipment and Technology,Huazhong University of Science and Technology
基金
国家重点研发计划; 中国国家自然科学基金;
关键词
D O I
暂无
中图分类号
TB497 [技术管理]; TP18 [人工智能理论];
学科分类号
08 ; 081104 ; 0812 ; 0835 ; 1405 ;
摘要
The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated production and transportation scheduling problem(IPTSP) in hybrid flow shops, which is an extension of the hybrid flow shop scheduling problem(HFSP). In addition to the production scheduling on machines, the transportation scheduling process on automated guided vehicles(AGVs)is considered as another optimization process. In this problem, the transfer tasks of jobs are performed by a certain number of AGVs. To solve it, we make some preparation(including the establishment of task pool, the new solution representation and the new solution evaluation), which can ensure that satisfactory solutions can be found efficiently while appropriately reducing the scale of search space. Then, an effective genetic tabu search algorithm is used to minimize the makespan. Finally, two groups of instances are designed and three types of experiments are conducted to evaluate the performance of the proposed method. The results show that the proposed method is effective to solve the integrated production and transportation scheduling problem.
引用
收藏
页码:123 / 142
页数:20
相关论文
共 50 条
  • [41] A Scheduling Algorithm for On-Time Production in A Hybrid Flow Shop Manufacturing Process
    Lee, Junhee
    Yoon, Young Seog
    Park, Kwangroh
    2019 10TH INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGY CONVERGENCE (ICTC): ICT CONVERGENCE LEADING THE AUTONOMOUS FUTURE, 2019, : 1243 - 1247
  • [42] Heuristic method for the hybrid flow shop problem in batch production
    Lara, Andres Felipe Bernate
    Yalaoui, Farouk
    Dugardin, Frederic
    Entzmann, Francoise
    2013 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2013, : 149 - 153
  • [43] Hybrid flow shop scheduling with finite buffers
    Han Z.
    Sun Y.
    Ma X.
    Lv Z.
    International Journal of Simulation and Process Modelling, 2018, 13 (02): : 156 - 166
  • [44] An Effective Hybrid Heuristic for Flow Shop Scheduling
    D.-Z. Zheng
    L. Wang
    The International Journal of Advanced Manufacturing Technology, 2003, 21 (1) : 38 - 44
  • [45] An effective hybrid heuristic for flow shop scheduling
    Wang, L. (wangling@mail.tsinghua.edu.cn), 1600, Springer-Verlag London Ltd (21):
  • [46] Hybrid Flow Shop Scheduling with Several Users
    Goren, Selcuk
    Pierreval, Henri
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 898 - 907
  • [47] A hybrid algorithm for flow shop scheduling problem
    Zhang, Changsheng
    Sun, Jigui
    Ning, Jiaxu
    Yang, Qingyun
    2008 PROCEEDINGS OF INFORMATION TECHNOLOGY AND ENVIRONMENTAL SYSTEM SCIENCES: ITESS 2008, VOL 1, 2008, : 182 - 188
  • [48] An effective hybrid heuristic for flow shop scheduling
    Wang, L
    Zheng, DZ
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 21 (01): : 38 - 44
  • [49] HYBRID FLOW SHOP SCHEDULING OF AUTOMOTIVE PARTS
    Somboonwiwat, Tuanjai
    Ratcharak, Chatkaew
    Supeekit, Tuangyot
    PROCEEDINGS - 31ST EUROPEAN CONFERENCE ON MODELLING AND SIMULATION ECMS 2017, 2017, : 204 - 208
  • [50] Hybrid flow shop scheduling with parallel batching
    Amin-Naseri, Mohammad Reza
    Beheshti-Nia, Mohammad Ali
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 117 (01) : 185 - 196