Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

被引:0
|
作者
Wangming Li [1 ]
Dong Han [1 ]
Liang Gao [1 ]
Xinyu Li [1 ]
Yang Li [1 ]
机构
[1] The State Key Laboratory of Digital Manufacturing Equipment and Technology,Huazhong University of Science and Technology
基金
国家重点研发计划; 中国国家自然科学基金;
关键词
D O I
暂无
中图分类号
TB497 [技术管理]; TP18 [人工智能理论];
学科分类号
08 ; 081104 ; 0812 ; 0835 ; 1405 ;
摘要
The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated production and transportation scheduling problem(IPTSP) in hybrid flow shops, which is an extension of the hybrid flow shop scheduling problem(HFSP). In addition to the production scheduling on machines, the transportation scheduling process on automated guided vehicles(AGVs)is considered as another optimization process. In this problem, the transfer tasks of jobs are performed by a certain number of AGVs. To solve it, we make some preparation(including the establishment of task pool, the new solution representation and the new solution evaluation), which can ensure that satisfactory solutions can be found efficiently while appropriately reducing the scale of search space. Then, an effective genetic tabu search algorithm is used to minimize the makespan. Finally, two groups of instances are designed and three types of experiments are conducted to evaluate the performance of the proposed method. The results show that the proposed method is effective to solve the integrated production and transportation scheduling problem.
引用
收藏
页码:123 / 142
页数:20
相关论文
共 50 条
  • [1] Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
    Li, Wangming
    Han, Dong
    Gao, Liang
    Li, Xinyu
    Li, Yang
    CHINESE JOURNAL OF MECHANICAL ENGINEERING, 2022, 35 (01)
  • [2] Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
    Wangming Li
    Dong Han
    Liang Gao
    Xinyu Li
    Yang Li
    Chinese Journal of Mechanical Engineering, 2022, 35
  • [3] Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
    Wangming Li
    Dong Han
    Liang Gao
    Xinyu Li
    Yang Li
    Chinese Journal of Mechanical Engineering, 2022, 35 (01) : 123 - 142
  • [4] Integrated scheduling of production and transportation in distributed heterogeneous hybrid flow shop
    Li, Yingli
    Liu, Ao
    Deng, Xudong
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (11): : 4087 - 4098
  • [5] Integrated production - Transportation scheduling in a two-machine flow shop
    Feng, Zhou
    Liang, Gao
    Li, Nie
    TIRMDCM 2007: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON TECHNOLOGY INNOVATION, RISK MANAGEMENT AND SUPPLY CHAIN MANAGEMENT, VOLS 1 AND 2, 2007, : 142 - 146
  • [6] Hybrid Hyper-heuristic Algorithm for Integrated Production and Transportation Scheduling Problem in Distributed Permutation Flow Shop
    Chen, Wenbo
    Qian, Bin
    Hu, Rong
    Zhang, Sen
    Wang, Yijun
    ADVANCED INTELLIGENT COMPUTING TECHNOLOGY AND APPLICATIONS, ICIC 2023, PT I, 2023, 14086 : 85 - 96
  • [7] A production scheduling system in a hybrid flow shop
    Uetake, T
    Tsubone, H
    Ohba, M
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 41 (1-3) : 395 - 398
  • [8] Integrated modeling and optimization of production planning and scheduling in hybrid flow shop for order production mode
    Chu, Hongyan
    Dong, Ke
    Li, Rui
    Cheng, Qiang
    Zhang, Caixia
    Huang, Kaifeng
    Yang, Congbin
    Zheng, Yaqi
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
  • [9] Production data-based dynamic scheduling method for hybrid flow shop
    Gu W.
    Liu S.
    Li T.
    Li Y.
    Zheng K.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (04): : 1242 - 1254
  • [10] A Knowledge-Driven Hybrid Algorithm for Solving the Integrated Production and Transportation Scheduling Problem in Job Shop
    Yao, Youjie
    Wang, Cuiyu
    Li, Xinyu
    Gao, Liang
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2025, 26 (02) : 2707 - 2720