共 50 条
- [41] Navigation condition of the upstream of three Gorges Project dam during the initial 32 years Qinghua Daxue Xuebao, 1 (55-58):
- [42] Criteria of checking and accepting for the quality of the foundation rock at the dam site of the Three Gorges Project COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 3, 1997, : 1793 - 1798
- [43] Construction and quality analysis of curtain grouting in foundation of dam for Yangtze Three Gorges Project GEOTECHNICAL ENGINEERING FOR DISASTER MITIGATION AND REHABILITATION, 2008, : 790 - +
- [44] Study on penstocks without expansion joint between dam and powerhouse in Three Gorges Project Shuili Xuebao/Journal of Hydraulic Engineering, 2003, (02):
- [45] Applying Policy Network Theory to the Decision Making Process of the Three Gorges Dam Project ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 631 - 638
- [48] On the Culture of Three Gorges Project PROCEEDINGS OF THE 5TH INTERNATIONAL YELLOW RIVER FORUM ON ENSURING WATER RIGHT OF THE RIVER'S DEMAND AND HEALTHY RIVER BASIN MAINTENANCE, VOL IV, 2015, : 11 - 25
- [50] Three Gorges Project and the environment DAMS AND RESERVOIRS, SOCIETIES AND ENVIRONMENT IN THE 21ST CENTURY, VOLS 1 AND 2, 2006, : 1109 - +