A probe into“mining technique in the condition of floor failure”for coal seam above longwall goafs

被引:8
|
作者
冯国瑞 [1 ]
王鲜霞 [2 ]
康立勋 [1 ]
机构
[1] Institute of Mining Technology,Taiyuan University of Technology,Taiyuan 030024,China
[2] College of Science,Taiyuan University of Technology,Taiyuan 030024,China
关键词
mining technique in the condition of floor failure; longwall goafs; probability-integral method;
D O I
暂无
中图分类号
TD823 [地下开采方法];
学科分类号
081901 ;
摘要
Targeting at the coal seam with useful value discarded above goafs,attempted to explore the feasibility of"mining technique in the condition of floor failure" from theoretical point of view,and predicted.It indicated that mining technique in the condition of floor failure used above Longwall Goafs in Baijiazhuang Mining is totally feasible.At law,the deformation of the floor in the mining technique by means of probability-integral method.And it is discov- ered that deformed basin can emerge in the footwall of No.6 coal seam and its maximum subsidence was possibly 1 633 mm or so and its maximum positive curvature is 61.74/10-3. At last,it therefore suggests appropriate ground pressure control measures as strengthening observation of ground pressure and adopting false slope for exploitation and strengthening support for reasonable push and slide based on the adverse ground pressure behaviors possibly occurring in the mining technique.This serves to gather data and lay sturdy founda- tion for further probe into the mining technique,and offers theoretical and technical grounds for concrete implementation of the mining technique.
引用
收藏
页码:19 / 23
页数:5
相关论文
共 50 条
  • [41] Failure characteristics analysis of deep coal seam floor
    Zhang F.
    Shen B.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2019, 36 (01): : 44 - 50
  • [42] Optimization of Caving Technology in an Extrathick Seam with Longwall Top Coal Caving Mining
    Yang, Liu
    Li, Lianghui
    Wei, Weijie
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2021, 2021
  • [43] Paste Backfilling Longwall Mining Technology for Thick Coal Seam Extraction under Buildings and above Confined Aquifers: A Case Study
    Wen, Peng
    Guo, Wenbing
    Tan, Yi
    Bai, Erhu
    Ma, Zhibao
    Wu, Dongtao
    Yang, Weiqiang
    MINERALS, 2022, 12 (04)
  • [44] The influence of distant coal seam edges on seismic hazard during longwall mining
    Wojtecki, Lukasz
    Golda, Iwona
    Mendecki, Maciej J.
    JOURNAL OF SEISMOLOGY, 2021, 25 (01) : 283 - 299
  • [45] Analysis of mining effect in the inclined coal seam floor with fault
    Bai, H. (hbobai@126.com), 1600, E-Journal of Geotechnical Engineering (19 K):
  • [46] Analysis of mining effect in the inclined coal seam floor with fault
    Bai, Haibo (hbobai@126.com), 1600, E-Journal of Geotechnical Engineering (19):
  • [47] Optimal Selection of a Longwall Mining Method for a Thin Coal Seam Working Face
    Wang Chen
    Tu Shihao
    Chen Min
    Yuan Yong
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2016, 41 (09) : 3771 - 3781
  • [48] Calculation of Residual Surface Subsidence Above Abandoned Longwall Coal Mining
    Cui, Ximin
    Zhao, Yuling
    Wang, Guorui
    Zhang, Bing
    Li, Chunyi
    SUSTAINABILITY, 2020, 12 (04)
  • [49] Optimal Selection of a Longwall Mining Method for a Thin Coal Seam Working Face
    Wang Chen
    Tu Shihao
    Chen Min
    Yuan Yong
    Arabian Journal for Science and Engineering, 2016, 41 : 3771 - 3781
  • [50] Optimization of Caving Technology in an Extrathick Seam with Longwall Top Coal Caving Mining
    Yang, Liu
    Li, Lianghui
    Wei, Weijie
    Advances in Materials Science and Engineering, 2021, 2021