Two-stage precipitation process of iron and arsenic from acid leaching solutions

被引:0
|
作者
N.J.BOLIN [1 ]
J.E.SUNDKVIST [1 ]
机构
[1] Boliden Mineral AB,SE-936 81 Boliden
关键词
leaching; bioleaching; precipitation; iron removal;
D O I
暂无
中图分类号
TF18 [微生物冶金];
学科分类号
080601 ;
摘要
A leaching process for base metals recovery often generates considerable amounts of impurities such as iron and arsenic into the solution.It is a challenge to separate the non-valuable metals into manageable and stable waste products for final disposal, without loosing the valuable constituents.Boliden Mineral AB has patented a two-stage precipitation process that gives a very clean iron-arsenic precipitate by a minimum of coprecipitation of base metals.The obtained product shows to have good sedimentation and filtration properties,which makes it easy to recover the iron-arsenic depleted solution by filtration and washing of the precipitate. Continuos bench scale tests have been done,showing the excellent results achieved by the two-stage precipitation process.
引用
收藏
页码:1513 / 1517
页数:5
相关论文
共 50 条
  • [21] Recycling copper and gold from e-waste by a two-stage leaching and solvent extraction process
    Rao, Mudila Dhanunjaya
    Singh, Kamalesh K.
    Morrison, Carole A.
    Love, Jason B.
    SEPARATION AND PURIFICATION TECHNOLOGY, 2021, 263
  • [22] Recovery of Rare Metals from Superalloy Scraps by an Ultrasonic Leaching Method with a Two-Stage Separation Process
    Wang, Long
    Lu, Sujun
    Fan, Jiayuan
    Ma, Yutian
    Zhang, Juan
    Wang, Shiyang
    Pei, Xiaoyao
    Sun, Yuan
    Lv, Guozhi
    Zhang, Tingan
    SEPARATIONS, 2022, 9 (07)
  • [23] Selective Extraction of Vanadium from Vanadium-Bearing Stone Coal by a Two-Stage Leaching Process
    Liu, Honghui
    Qian, Qifeng
    Xiao, Lingchao
    Li, Gaige
    JOM, 2024,
  • [24] Recovery of Valuable Metals from Zinc Plant Residues by Two-Stage Selective Atmospheric Leaching Process
    Li, Cun-xiong
    Wei, Chang
    Xu, Hongsheng
    Deng, Zhigan
    Liao, Jiqiang
    Li, Xingbin
    Li, Minting
    ADVANCES IN CHEMICAL ENGINEERING, PTS 1-3, 2012, 396-398 : 552 - 555
  • [25] Two-stage airlift bioreactor system for efficient iron oxidation and jarosite precipitation
    Kaksonen, Anna H.
    Morris, Christina
    Hilario, Felipe
    Rea, Suzy
    Li, Jian
    Usher, Kayley
    Wylie, Jason
    Ginige, Maneesha
    Cheng, Ka Yu
    du Plessis, Chris
    INTEGRATION OF SCIENTIFIC AND INDUSTRIAL KNOWLEDGE ON BIOHYDROMETALLURGY, 2013, 825 : 242 - +
  • [26] Oxidation Leaching of Arsenic Containing Dust with Sulfuric Acid and Arsenic Removal by Precipitation
    Bi, Fan
    Qin, Qingwei
    Wu, Xinglin
    Tang, Haibo
    2016 INTERNATIONAL CONFERENCE ON MATERIAL, ENERGY AND ENVIRONMENT ENGINEERING (ICM3E 2016), 2016, : 404 - 410
  • [27] Deposition of Arsenic from Nitric Acid Leaching Solutions of Gold-Arsenic Sulphide Concentrates
    Karimov, Kirill
    Rogozhnikov, Denis
    Kuzas, Evgeniy
    Dizer, Oleg
    Golovkin, Dmitry
    Tretiak, Maksim
    METALS, 2021, 11 (06)
  • [28] Reduction process of iron ores in a two-stage fluidized bed system
    Hahn, YB
    Lee, JS
    Lee, IS
    Chang, KS
    EPD CONGRESS 1996, 1996, : 621 - 636
  • [29] A two-stage process for simultaneous thermophilic sludge digestion, pathogen control and metal leaching
    Narayanan, R.
    Sreekrishnan, T. R.
    ENVIRONMENTAL TECHNOLOGY, 2009, 30 (01) : 21 - 26
  • [30] The two-stage contact process
    Krone, SM
    ANNALS OF APPLIED PROBABILITY, 1999, 9 (02): : 331 - 351