Steel ladle exchange models during steelmaking and continuous casting process

被引:0
|
作者
Bang-fu Huang [1 ,2 ]
Nai-yuan Tian [3 ]
Zhe Shi [1 ,2 ]
Zhi-wei Ma [1 ,2 ]
机构
[1] Faculty of Metallurgical and Energy Engineering,Kunming University of Science and Technology
[2] Clean Metallurgy Key Laboratory of Complex Iron Resources
[3] School of Metallurgical and Ecological Engineering,University of Science and Technology Beijing
关键词
Steelmaking; Continuous casting; Steel ladle; Exchange model; Turnover optimization; Production scheduling;
D O I
暂无
中图分类号
TF777 [连续铸钢、近终形铸造];
学科分类号
摘要
The models and influencing factors of steel ladles exchange during the steelmaking and continuous casting process of H steel plant were investigated.Based on analysis of the operation process and turnover time of steel ladles,relationship models for the turnover number,turnover rate,continuous casting number,number of ladles with additional turnover,and number of ladles without additional turnover were built.The turnover rules of steel ladles for one basic oxygen furnace(BOF)matching one continuous caster(CC)and two BOFs matching two CCs modes were simulated by using a Gantt chart.The models of steel ladle exchange were proposed for casting of a single CC and overlapping casting of two CCs.By analyzing the influencing factors,the following conclusions were drawn.The exchange ladle should not have the task of transporting liquid steel in the CC that stops casting earlier.The end time of the empty ladle in the CC that stops casting earlier should be earlier than the start time of the full ladle in the CC that stops casting later.After evaluating the factors influencing the start casting time,turnover cycle,casting time,continuous casting number,and overlapping time,a prioritization scheme of steel ladle exchange was proposed based on the steel grade.First,the turnover cycle and single heat casting time were determined;based on these,a reasonable ladle turnover number was calculated.Second,the turnover number and continuous casting number were optimized for maximizing the number of ladles without additional turnover.Lastly,to reduce the casting number during the overlapping time to be lower than the turnover number,the overlapping time was shortened.
引用
收藏
页码:617 / 624
页数:8
相关论文
共 50 条
  • [31] Lagrangian heuristic for scheduling a steelmaking-continuous casting process
    Mao, Kun
    Pan, Quanke
    Tasgetiren, M. Fatih
    PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING (CISCHED), 2013, : 68 - 74
  • [32] Hydrodynamic fluxes of steel in the intermediate ladle of a continuous-casting machine
    Feiler S.V.
    Protopopov E.V.
    Komshukov V.P.
    Ganzer L.A.
    Steel in Translation, 2008, 38 (12) : 961 - 967
  • [33] The effects of casting speed on steel continuous casting process
    Mohammad Sadat
    Ali Honarvar Gheysari
    Saeid Sadat
    Heat and Mass Transfer, 2011, 47 : 1601 - 1609
  • [34] The effects of casting speed on steel continuous casting process
    Sadat, Mohammad
    Gheysari, Ali Honarvar
    Sadat, Saeid
    HEAT AND MASS TRANSFER, 2011, 47 (12) : 1601 - 1609
  • [35] Ladle Nozzle Clogging during casting of Silicon-Steel
    Kong, Wei
    Chen, Ying-Feng
    Cang, Da-Giang
    HIGH TEMPERATURE MATERIALS AND PROCESSES, 2019, 38 : 813 - 821
  • [36] DETERMINING THE CORRELATION BETWEEN THE LIQUID STEEL TEMPERATURES AND THE TEMPERATURES OF THE CASTING LADLE ENCASING SURFACE DURING TRANSPORTATION TO THE CONTINUOUS CASTING STATION
    Angelescu, Nicolae
    Paunescu, Lucian
    Surugiu, Gheorghe
    METALURGIA INTERNATIONAL, 2009, 14 (10): : 16 - 21
  • [37] Thoughts about the initial solidification process during continuous casting of steel
    Fredriksson, H
    Elfsberg, J
    SCANDINAVIAN JOURNAL OF METALLURGY, 2002, 31 (05) : 292 - 297
  • [38] Simulation on the microstructure and microsegregation of carbon steel during continuous casting process
    Guo, Wei
    Zhang, Li-Feng
    Zhu, Miao-Yong
    Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2010, 32 (03): : 319 - 324
  • [39] New Process with Argon Injected into Ladle around the Tapping Hole for Controlling Slag Carry-over during Continuous Casting Ladle
    Zheng, Shuguo
    Zhu, Miaoyong
    METALS, 2018, 8 (08):
  • [40] Optimization of Vortex Slag Entrainment during Ladle Teeming Process in the Continuous Casting of Automobile Outer Panel
    Zhou, Haichen
    Li, Haibo
    Deng, Xiaoxuan
    Liu, Baisong
    Ji, Chenxi
    Chen, Bin
    Wang, Chong
    Zhao, Changliang
    STEEL RESEARCH INTERNATIONAL, 2024, 95 (10)