共 50 条
- [41] Traveltime computation using fast marching method under complex topographical conditions Jisuan Wuli/Chinese Journal of Computational Physics, 2010, 27 (02): : 281 - 286
- [44] Application of Monte-Carlo method in the reliability calculation of bus travel time Shanghai Ligong Daxue Xuebao, 2006, 1 (59-62):
- [45] The Calculation Method of Road Travel Time Based on License Plate Recognition Technology ADVANCES IN INFORMATION TECHNOLOGY AND EDUCATION, PT I, 2011, 201 : 385 - +
- [46] A time-marching method for the calculation of nonsimilar 3D boundary layers on turbomachinery blades JOURNAL OF FLUIDS ENGINEERING-TRANSACTIONS OF THE ASME, 1998, 120 (04): : 799 - 807
- [50] Seismic travel-time calculation based on wave-front construction and Lie algebra integral Jilin Daxue Xuebao (Diqiu Kexue Ban)/Journal of Jilin University (Earth Science Edition), 2010, 40 (06): : 1463 - 1470