A profit maximization problem of equipment rental and scheduling with split services

被引:0
|
作者
Li, Xinyi [1 ]
Zhang, Canrong [1 ]
Zhu, Jiarao [2 ]
机构
[1] Tsinghua Univ, Inst Data & Informat, Shenzhen Int Grad Sch, Shenzhen, Peoples R China
[2] Shanghai Indusyun Network Technol Co Ltd, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; resource renting; split service; profit maximizing; branch-and-price; VEHICLE-ROUTING PROBLEM; RESOURCE RENTING PROBLEM; WORST-CASE ANALYSIS; ORIENTEERING PROBLEM; EXACT ALGORITHM; CUT ALGORITHMS; TIME WINDOWS; BRANCH; PRICE; DELIVERIES;
D O I
10.1080/24725854.2024.2398220
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study addresses a scheduling problem arising from the "Rent Instead of Buy" business model where rental service platforms rent equipment from suppliers to satisfy customer requests in exchange for a lump-sum payment. Suppliers often implement piecewise linear concave charging policies to encourage longer rental duration. This policy prompts the platform to consolidate service periods into longer rental agreements for lower rental rates, potentially necessitating the splitting of a customer request among multiple facilities. We establish an integer programming model to maximize the platform's profit, which is equal to the total revenue from serving customers minus the total rental and scheduling costs. To solve the problem, we propose two Dantzig-Wolfe decomposition reformulations and design branch-and-price algorithms accordingly. Furthermore, by exploiting the property of the concave rental cost functions, we derive the optimal structure regarding the start and end times of services, significantly reducing the subproblem's search space. Numerical experiments based on real-life data validate the efficiency of the designed algorithms compared to commercial solvers and highlight the benefits of split services. Sensitivity analysis reveals that as the rental cost function becomes more segmented, more requests are split-serviced, but the times for splitting a request are seldom more than once.
引用
收藏
页数:22
相关论文
共 50 条
  • [31] Multi-Period LTE RAN and Services Planning for Operator Profit Maximization
    Ageyev, Dmytro
    Al-Anssari, Ali
    Qasim, Nameer
    PROCEEDINGS OF XIIITH INTERNATIONAL CONFERENCE - EXPERIENCE OF DESIGNING AND APPLICATION OF CAD SYSTEMS IN MICROELECTRONICS CADSM 2015, 2015, : 25 - 27
  • [32] The Equipment Scheduling and Assignment Problem in the Overhaul Industry
    Torkashvanda, M.
    Shamami, N.
    Bigdeli, H.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2023, 36 (06): : 1150 - 1165
  • [33] Profit maximization based task scheduling in hybrid clouds using whale optimization technique
    Sanaj, M. S.
    Prathap, Joe P. M.
    Alappatt, Valanto
    INFORMATION SECURITY JOURNAL, 2020, 29 (04): : 155 - 168
  • [34] Optimal power scheduling of thermal units considering emission constraint for GENCOs' profit maximization
    Ghadi, M. Jabbari
    Karin, A. Itami
    Baghramian, A.
    Imani, M. Hosseini
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 82 : 124 - 135
  • [35] Geography-Aware Task Scheduling for Profit Maximization in Distributed Green Data Centers
    Yuan, Haitao
    Bi, Jing
    Zhou, MengChu
    IEEE TRANSACTIONS ON CLOUD COMPUTING, 2022, 10 (03) : 1864 - 1874
  • [36] Personality- and Value-Aware Scheduling of User Requests in Cloud for Profit Maximization
    Cong, Peijin
    Xu, Guo
    Zhou, Junlong
    Chen, Mingsong
    Wei, Tongquan
    Qiu, Meikang
    IEEE TRANSACTIONS ON CLOUD COMPUTING, 2022, 10 (03) : 1991 - 2004
  • [37] Long term profit maximization strategy for charging scheduling of electric vehicle charging station
    Rabiee, Abdorreza
    Ghiasian, Ali
    Chermahini, Moslem Amiri
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (18) : 4134 - 4141
  • [38] Optimized model formulation through product mix scheduling for profit maximization in the apparel industry
    Abeje, Andualem Asmamaw
    Abtew, Mulat Alubel
    Kasie, Fentahun Moges
    Seid, Bahredin Abdella
    AUTEX RESEARCH JOURNAL, 2025, 25 (01)
  • [39] Profit-maximization generation maintenance scheduling through bi-level programming
    Mazidi, Peyman
    Tohidi, Yaser
    Ramos, Andres
    Sanz-Bobi, Miguel A.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (03) : 1045 - 1057
  • [40] Risk strategy analysis for an online rental problem of durable equipment with a transaction cost
    Xin, Chunlin
    Zhang, Jianwen
    Wang, Ziping
    JOURNAL OF ALGORITHMS & COMPUTATIONAL TECHNOLOGY, 2021, 15