Model of cost management for the Jakarta Bandung High Speed Railway Project

被引:0
|
作者
Salim, Indra Putra [1 ]
Simanjuntak, Manlian Ronald A. [2 ]
Jin, Oei Fuk [1 ]
机构
[1] Tarumanagara Univ Jakarta, Jl Letjen S Parman 1,RT6-RW16, Jakarta 11440, Indonesia
[2] 17 Agustus 1945 Univ, Jl Sunter Permai Raya,Sunter Agung Kec Tj Priok, Jakarta 14350, Indonesia
关键词
cost management; project management; construction management; high-speed railway; content validity ratio; factor analysis; structural equation modelling; STRUCTURAL EQUATION MODEL;
D O I
10.1680/jmapl.24.00017
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The completion of the Jakarta-Bandung High-speed railway (JBHSR) project in 2023 marks a significant milestone for Indonesia, showcasing enhanced connectivity between two cities of Jakarta and Bandung. Despite facing challenges, particularly in cost management, this study employs content validity ratio, factor analysis and structural equation modelling to address these issues. Surveying 404 stakeholders, it highlights the crucial role of cost planning in project success, aligning with existing literature on similar endeavors. The final model refines 108 cost management attributes as per PMBOK guidelines, namely, cost management process involves planning, estimation, budget determination, and cost control. The outcomes of the final structural equation model underscore the significance of cost control in enhancing both cost efficiency and project success, aligning with findings from literature on similar projects. The novelty of this study lies in its application of content validity ratio, factor analysis and structural equation modelling within the context of high-speed railway projects, adding to the existing literature on infrastructure development in Indonesia. This research offers valuable insights for practitioners and policymakers involved in the planning and execution of large-scale infrastructure projects, potentially leading to enhanced cost efficiency and project success in similar projects in the future.
引用
收藏
页数:45
相关论文
共 50 条
  • [21] Design and Analysis of Bandung-Jakarta High-Speed Rail Fiber Optic Backbone Network
    Fikri, Naufal Inas
    Budyprawira, Primayoga
    Pasaribu, Stevan Togar
    Farida, Listi
    Apriono, Catur
    Proceeding - 2022 International Symposium on Information Technology and Digital Innovation: Technology Innovation During Pandemic, ISITDI 2022, 2022, : 172 - 176
  • [22] Dynamic Pricing Model of High-speed Railway Based on Opportunity Cost
    Cui L.
    Hou Q.
    Tiedao Xuebao/Journal of the China Railway Society, 2021, 43 (03): : 9 - 17
  • [23] The Indonesia High-Speed Train Traveler Preference Analysis (Case Study: Jakarta-Bandung)
    Tjahjono, Tri
    Kusuma, Andyka
    Tinumbia, Nuryani
    Septiawan, Ahmad
    RECENT PROGRESS ON: MECHANICAL, INFRASTRUCTURE AND INDUSTRIAL ENGINEERING, 2020, 2227
  • [24] Monitoring Subsidence over the Planned Jakarta-Bandung (Indonesia) High-Speed Railway Using Sentinel-1 Multi-Temporal InSAR Data
    Luo, Qingli
    Li, Jian
    Zhang, Yuanzhi
    REMOTE SENSING, 2022, 14 (17)
  • [25] COOPERATIVE PROJECT FOR A HIGH-SPEED, HIGH-POWER RAILWAY
    不详
    ELEKTROTECHNISCHE ZEITSCHRIFT B-AUSGABE, 1971, 23 (25): : 639 - &
  • [26] Project of High-speed Railway and Sustainable Development Evaluating
    Liu, Lin
    Liu, Wei
    ADVANCED MATERIALS RESEARCH, 2011, 213 : 216 - +
  • [27] Life-Cycle Cost Model of High-Speed Railway Considering Carbon Emissions
    Wang, Xingju
    Liu, Jiayu
    Long, Fenjie
    Lu, Pan
    Ren, Yihao
    Chen, Jinjie
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2023, 29 (03)
  • [28] Coupled electromechanical cost optimization of high speed railway overheads
    Jimenez-Octavio, J. R.
    Pilo, E.
    Lopez-Garcia, O.
    Carnicero, A.
    Proceedings of the 2006 Joint Rail Conference on Restoring and Upgrading Rail Infrastructure, Rolling Stock and Systems, 2006, 31 : 231 - 240
  • [29] Study on the Average Cost for High-speed Railway Travelers
    Xu Peijuan
    PROCEEDINGS OF 2012 7TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, VOLS I-VI, 2012, : 1226 - 1230
  • [30] Explore the Public Railway Construction Project Management Model
    Li Lizeng
    Han Tongyin
    Hou Juan
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 195 - +