Simulation of Operation Characteristics of Helical Coiled Once-Through Steam Generator in Start-Up Stage

被引:0
|
作者
Gao, Ya-xin [1 ]
Zheng, Xiong [1 ]
Chen, Tian-ming [1 ]
Zhou, Ming-jia [1 ]
Mao, Yu-long [1 ]
Hu, Yi-song [1 ]
Lu, Xiang-hui [1 ]
Rui, Min [1 ]
机构
[1] China Nucl Power Technol Res Inst Co Ltd, Shenzhen 518000, Peoples R China
关键词
Helical tube; start-up strategy; flow instability;
D O I
10.1007/978-981-97-7055-7_28
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Helical coiled once-through steam generator (HOTSG) has advantages of compact structure and high heat transfer efficiency, which is widely used in the design of advanced small reactor. During the start-up stage, the water inside HOTSG would change from subcooling state to two-phase state, and further be heated to superheated state. Thus, the phase change process in start-up stage is easy to induce flow instability and lead to the helical tubes burning dry, even threaten the safe operation. Several start-up schemes was proposed in this study and analyzed with self-developed code WISTARIA. The variations of flow rate and pressure were analyzed, which were employed to evaluate the system stability. The results shows that by reasonably controlling the changes of key operating parameters, such as flow rate and pressure, it can quickly pass through the unstable two-phase region and reduce the fluctuation of flow rate, which provides guidance for the design and operation of HOTSG start-up stage.
引用
收藏
页码:319 / 326
页数:8
相关论文
共 50 条
  • [21] NUCLEAR ONCE-THROUGH STEAM GENERATOR
    MCDONALD, BN
    JOHNSON, LE
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1970, : 19 - &
  • [22] Study on the systematic thermal-hydraulic characteristics of helical coil once-through steam generator
    Yao, Hao
    Chen, Guo
    Lu, Kailin
    Wu, Yingwei
    Tian, Wenxi
    Su, Guanghui
    Qiu, Suizheng
    ANNALS OF NUCLEAR ENERGY, 2021, 154
  • [23] Simulation Research on Dynamic Characteristics and Small Break Fault of Once-through Steam Generator
    Xu, Yu
    Huangfu, Zeyu
    Xu, Jianqun
    Tian, Peiyu
    Li, Chunmei
    Cheng, Xiang
    Yan, Siwei
    Liao, Xianwei
    Hedongli Gongcheng/Nuclear Power Engineering, 2021, 42 (02): : 161 - 167
  • [24] Model-based once-through boiler start-up water wall steam temperature control
    Cheng, X
    Kephart, RW
    Menten, CH
    PROCEEDINGS OF THE 2000 IEEE INTERNATIONAL CONFERENCE ON CONTROL APPLICATIONS, 2000, : 778 - 783
  • [25] LINEAR MATHEMATICAL-MODEL FOR CALCULATING DYNAMICS OF A ONCE-THROUGH STEAM-GENERATOR IN A START UP
    KRASHENNIKOV, VV
    DOVERMAN, GI
    DUMNOV, VP
    CHEREPANOVA, IM
    THERMAL ENGINEERING, 1976, 23 (08) : 16 - 20
  • [26] ONCE-THROUGH STEAM-GENERATOR - OCONEE-1 OPERATION
    BERTOLOT.G
    MCDONALD, BN
    MICHAUD, ER
    ENERGIA NUCLEARE, 1974, 21 (8-9): : 484 - 494
  • [27] Optimization of start-up and shutdown regimes for once-through and drum boilers
    Kalinichev, V.M.
    Glusker, B.N.
    Zotikov, A.V.
    Kholshchev, V.V.
    Lepaev, P.A.
    Teploenergetika, 2003, (04): : 12 - 16
  • [28] Water circulation control during once-through boiler start-up
    Eitelberg, E
    Boje, E
    CONTROL ENGINEERING PRACTICE, 2004, 12 (06) : 677 - 685
  • [29] HELICAL PITCH OPTIMIZATION OF DOUBLE-TUBE ONCE-THROUGH STEAM GENERATOR
    Fang, Huawei
    Wei, Xinyu
    Yan, Shoujun
    Wan, Jiashuang
    Zhao, Fuyu
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 2A, 2014,
  • [30] Analysis of Density Wave Oscillations in Helically Coiled Tube Once-Through Steam Generator
    Hao, Junwei
    Zhang, Yaoli
    Zheng, Jianxiang
    Zhou, Zhiwei
    Sheng, Xuanyu
    Hong, Gang
    Ye, Kai
    Li, Ning
    SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2016, 2016