Generalized Optimal Scheduling of Cluster Tools With Reentrance and Residency Time Constraints

被引:0
|
作者
Li, Xin [1 ]
机构
[1] Educ Univ Hong Kong, Dept Math & Informat Technol, Hong Kong, Peoples R China
关键词
Generalized formulation; mixed-integer linear programming; reentrance; residency time; single-arm and dual-arm cluster tools; COMPLETION-TIME; WAFER DELAY; SCHEDULABILITY; PERFORMANCE; CHAMBERS;
D O I
10.1109/TSMC.2024.3466991
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Cluster tools have been widely used in the semiconductor industry. In previous work, singe-arm and dual-arm cluster tools are dealt with separately. When considering residency time constraints, algorithms for scheduling robot moving sequences are mainly developed based on backward and swap strategies, respectively. How about the performance of other robot moving sequences is still an open problem. The present work addresses general conditions by considering all feasible robot moving sequences-beyond backward- and swap-based strategies. In addition, both dual-arm and single-arm cluster tools with reentrance are handled simultaneously. To solve this, the problem is first divided into two parts-the basic one without reentrance and reentrant operations. Based on detailed analysis of all available robot operations in a cluster tool, mixed-integer programming formulations are developed for both parts. Subsequently, both illustrative examples and randomly generated instances are tested to validate the efficiency of the proposed approach. Results of one example show improvement comparing to previous work. Another two examples-not scheduled previously-are scheduled well by the proposed approach. Meanwhile, the flexibility of operations obtained by the proposed model is demonstrated by an example with six processing modules and 12 stages in a dual-arm cluster tool. Additionally, more randomly generated instances are tested more to validate the proposed approach and analyze computation time.
引用
收藏
页码:307 / 318
页数:12
相关论文
共 50 条
  • [21] Try and error-based scheduling algorithm for cluster tools of wafer fabrications with residency time constraints
    Zhou Bing-hai
    Li Xin
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (01) : 187 - 192
  • [22] A Cyclic Scheduling Approach to Single-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints
    Wang, Jipeng
    Pan, Chunrong
    Hu, Hesuan
    Li, Liang
    Zhou, Yuan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (03) : 1373 - 1386
  • [23] Scheduling of Single-Arm Multi-cluster Tools With Wafer Residency Time Constraints in Semiconductor Manufacturing
    Zhu, QingHua
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2015, 28 (01) : 117 - 125
  • [24] Feedback Control Design for Cluster Tools with Wafer Residency Time Constraints
    Kim, Chulhan
    Lee, Tae-Eog
    PROCEEDINGS 2012 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2012, : 3063 - 3068
  • [25] An optimal residency-aware scheduling technique for cluster tools with buffer module
    Rostami, S
    Hamidzadeh, B
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2004, 17 (01) : 68 - 73
  • [26] Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation
    Wu, NaiQi
    Zhou, MengChu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (01) : 203 - 209
  • [27] Real-Time Scheduling of Single-Arm Cluster Tools Subject to Residency Time Constraints and Bounded Activity Time Variation
    Qiao, Yan
    Wu, NaiQi
    Zhou, MengChu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (03) : 564 - 577
  • [28] Scheduling method for dual-blade multi-cluster tools with residency constraints
    Zhou, B. (bhzhou@tongji.edu.cn), 1600, Harbin Institute of Technology (46):
  • [29] Noncyclic Scheduling of Multi-Cluster Tools With Residency Constraints Based on Pareto Optimization
    Yan, Yuanyuan
    Wang, Huangang
    Tao, Qinghua
    Fan, Wenhui
    Lin, Tingyu
    Xiao, Yingying
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2020, 33 (03) : 476 - 486
  • [30] A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    Wu, Naiqi
    Chu, Chengbin
    Chu, Feng
    Zhou, Meng Chu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2008, 21 (02) : 224 - 237