Predicting Change Order Magnitude in Construction Projects-A Machine Learning Approach

被引:0
|
作者
Nabipour, Nariman [1 ,2 ]
Martinez, Araham [1 ,2 ]
Nik-Bakht, Mazdak [1 ,2 ]
机构
[1] Concordia Univ, Complecc Lab, Dept Bldg Civil & Environm Engn, Montreal, PQ, Canada
[2] Concordia Univ, Dept BCEE, Montreal, PQ, Canada
来源
PROCEEDINGS OF THE CANADIAN SOCIETY FOR CIVIL ENGINEERING ANNUAL CONFERENCE 2023, VOL 4, CSCE 2023 | 2025年 / 498卷
基金
加拿大自然科学与工程研究理事会;
关键词
Construction change management; Change orders; Data-driven decision-making;
D O I
10.1007/978-3-031-61499-6_11
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Each construction project is unique with specific characteristics meaning that unavoidable uncertainties can happen during the project lifecycle. A well-defined change order management process right at the outset of the project enables the needed flexibility component that helps project stakeholders on dealing with inaccurate estimations, unforeseen conditions, design developments, among others. On the other hand, considering cost, time, and quality as three major project success factors, change orders can also disrupt their trade-off. Thus, it is crucial for the parties involved in construction projects to be able to identify change orders' performance expectations prior to engaging to a project. Additionally, for ongoing projects, it is essential to have a proper overview of potential change orders to reduce the negative effects before happening. This paper attempts to quantitatively analyzing the predictability of change orders' magnitude in construction projects through machine learning techniques. To this aim, the following objectives and methods are followed: (i) predicting change orders' magnitude as a three-class classification problem using SVM (Support Vector Machine), and Random Forest (RF) classifiers on three distinct datasets containing information on 2002 projects and more than 87,000 change orders, and (ii) investigating the best performing prediction model when being subjected to the identification of projects with different level of change orders. Results show that change order magnitude is predictable with around 75% accuracy in a 3-class prediction scenario, and it can be improved to 87% when targeting a specific class of the target attribute in binary classification scenarios. This research supports stakeholders involved in construction projects by pinpointing problematic projects as early as in the bidding stage while offering more realistic insights into the expected change orders in active projects.
引用
收藏
页码:137 / 150
页数:14
相关论文
共 50 条
  • [21] A Machine-Learning Approach for Earthquake Magnitude Estimation
    Mousavi, S. Mostafa
    Beroza, Gregory C.
    GEOPHYSICAL RESEARCH LETTERS, 2020, 47 (01)
  • [22] A machine learning approach for predicting critical factors determining adoption of offsite construction in Nigeria
    Wusu, Godoyon Ebenezer
    Alaka, Hafiz
    Yusuf, Wasiu
    Mporas, Iofis
    Toriola-Coker, Luqman
    Oseghale, Raphael
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024, 13 (06) : 1408 - 1433
  • [23] An innovative approach to the assessment of change implementation in construction projects
    Motawa, I
    Anumba, CJ
    El-Hamalawi, A
    Chung, PWH
    Yeoh, M
    INNOVATIVE DEVELOPMENTS IN ARCHITECTURE, ENGINEERING AND CONTRUCTION, 2003, : 729 - 739
  • [24] A Systematic Approach to Modelling Change Processes in Construction Projects
    Motawa, Ibrahim A.
    CONSTRUCTION ECONOMICS AND BUILDING, 2005, 5 (01): : 23 - 31
  • [25] Machine Learning Algorithms for Construction Projects Delay Risk Prediction
    Gondia, Ahmed
    Siam, Ahmad
    El-Dakhakhni, Wael
    Nassar, Ayman H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (01)
  • [26] Using software metrics for predicting vulnerable classes and methods in Java']Java projects: A machine learning approach
    Sultana, Kazi Zakia
    Anu, Vaibhav
    Chong, Tai-Yin
    JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2021, 33 (03)
  • [27] Predicting complaints in semiconductor order fulfilment with machine learning
    Moder, Patrick
    Hoberg, Kai
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024,
  • [28] Predict the Polarizability and Order of Magnitude of Second Hyperpolarizability of Molecules by Machine Learning
    Zhao, Guoxiang
    Yan, Weiyin
    Wang, Zirui
    Kang, Yao
    Ma, Zuju
    Gu, Zhi-Gang
    Li, Qiao-Hong
    Zhang, Jian
    JOURNAL OF PHYSICAL CHEMISTRY A, 2023, 127 (29): : 6109 - 6115
  • [29] A Machine Learning Approach for Predicting Nicotine Dependence
    Kharabsheh, Mohammad
    Meqdadi, Omar
    Alabed, Mohammad
    Veeranki, Sreenivas
    Abbadi, Ahmad
    Alzyoud, Sukaina
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2019, 10 (03) : 179 - 184
  • [30] Machine Learning Approach for Predicting Bumps on Road
    Ghadge, Manjusha
    Pandey, Dheeraj
    Kalbande, Dhananjay
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON APPLIED AND THEORETICAL COMPUTING AND COMMUNICATION TECHNOLOGY (ICATCCT), 2015, : 481 - 485