Short-Term Optimal Scheduling of a Cascade Hydro-Photovoltaic System for Maximizing the Expectation of Consumable Electricity

被引:0
|
作者
Hu, Shuzhe [1 ]
Miao, Jinniu [2 ]
Wu, Jingyang [1 ]
Zhao, Liqian [2 ]
Wang, Yue [1 ]
Meng, Fanyan [3 ]
Wei, Chao [1 ]
Zhang, Xiaoqin [1 ]
Zhu, Benrui [4 ]
机构
[1] China Oil & Gas Piping Network Corp, Beijing 102206, Peoples R China
[2] China Petr Pipeline Engn Corp, Langfang 065000, Peoples R China
[3] China Petr Pipeline Res Inst Co Ltd, Langfang 065000, Peoples R China
[4] Tianjin Univ, Natl Key Lab Intelligent Construct & Operat & Main, Tianjin 300350, Peoples R China
关键词
cascade hydropower; complementary system; consumable electricity; mixed-integer linear programming; hydropower plant; POWER;
D O I
10.3390/pr13020328
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Fully leveraging the regulatory role of cascade hydropower in river basins and realizing complementary joint power generation between cascade hydropower and photovoltaic (PV) systems is a crucial approach to promoting the consumption of clean energy. Given the uncertainty of PV outputs, this paper introduces a short-term scheduling model for cascade hydropower-PV systems. The model aims to maximize electricity consumption by considering individual units, hydropower plant constraints, unit constraints, and grid constraints. By allocating loads among hydropower plants and periods, it optimizes hydropower's dual roles, supporting grid power supplies and coordinating with PVs, thus boosting the overall system consumption. In terms of model solution, linearization methods and modeling techniques such as piecewise linear approximation, the introduction of 0-1 integer variables, and the discretization of generation headwater are employed to handle the nonlinear constraints in the original model, transforming it into a mixed-integer linear programming problem. Finally, taking a complementary system constructed by 15 units of 4 hydropower stations and 2 photovoltaic groups in a cascade in a river basin in Southwest China as an example, the results show that through the complementary coordination of cascade hydropower and photovoltaic power, under the same grid constraints, the expected value of the power consumption of the complementary system in the model of this paper increased by 863.2 MW<middle dot>h, among which the power consumption of photovoltaic group 1 increased by 1035.7 MW<middle dot>h, and the power consumption of photovoltaic group 2 decreased by 172.5 MW<middle dot>h.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] A hybrid chaotic genetic algorithm for short-term hydro system scheduling
    Yuan, XH
    Yuan, YB
    Zhang, YC
    MATHEMATICS AND COMPUTERS IN SIMULATION, 2002, 59 (04) : 319 - 327
  • [22] Short-term balancing of supply and demand in an electricity system: forecasting and scheduling
    Jeanne Aslak Petersen
    Ditte Mølgård Heide-Jørgensen
    Nina Kildegaard Detlefsen
    Trine Krogh Boomsma
    Annals of Operations Research, 2016, 238 : 449 - 473
  • [23] Short-term balancing of supply and demand in an electricity system: forecasting and scheduling
    Petersen, Jeanne Aslak
    Heide-Jorgensen, Ditte Molgard
    Detlefsen, Nina Kildegaard
    Boomsma, Trine Krogh
    ANNALS OF OPERATIONS RESEARCH, 2016, 238 (1-2) : 449 - 473
  • [24] Short-Term Hydro Generation Scheduling Of Cascade Plants Operating On Litani River Project - Lebanon
    Bou-Fakhreddine, Bassam
    Abou-Chakra, Sara
    Mougharbel, Imad
    Faye, Alain
    Pollet, Yann
    2016 3RD INTERNATIONAL CONFERENCE ON RENEWABLE ENERGIES FOR DEVELOPING COUNTRIES (REDEC), 2016,
  • [25] Optimal photovoltaic capacity of large-scale hydro-photovoltaic complementary systems considering electricity delivery demand and reservoir characteristics
    Zhang, Yusheng
    Ma, Chao
    Lian, Jijian
    Pang, Xiulan
    Qiao, Yanan
    Chaima, Evance
    ENERGY CONVERSION AND MANAGEMENT, 2019, 195 : 597 - 608
  • [26] A note on short-term hydro-thermal scheduling
    Esmaeily, Ali
    Raeisi, Fatima
    Ahmadi, Abdollah
    Ahmadi, Mohammad Reza
    ENERGY CONVERSION AND MANAGEMENT, 2016, 126 : 1178 - 1186
  • [27] A diploid genetic approach to short-term scheduling of hydro-thermal system
    Wu, YG
    Ho, CY
    Wang, DY
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (04) : 1268 - 1274
  • [28] Optimal Scheduling of a Virtual Power Plant with Demand Response in Short-Term Electricity Market
    Rashidizadeh-Kermani, Homa
    Shafie-Khah, Miadreza
    Osorio, Gerardo J.
    Catalao, Joao P. S.
    Vahedipour-Dahraie, Mostafa
    20TH IEEE MEDITERRANEAN ELETROTECHNICAL CONFERENCE (IEEE MELECON 2020), 2020, : 599 - 604
  • [29] A short-term optimal scheduling model for wind-solar-hydro hybrid generation system with cascade hydropower considering regulation reserve and spinning reserve requirements
    Xie, Jun
    Zheng, Yimin
    Pan, Xueping
    Zheng, Yuan
    Zhang, Liqin
    Zhan, Yongsheng
    Xie, Jun (jxie@hhu.edu.cn), 1600, Institute of Electrical and Electronics Engineers Inc. (09): : 10765 - 10777
  • [30] A Short-Term Optimal Scheduling Model for Wind-Solar-Hydro Hybrid Generation System With Cascade Hydropower Considering Regulation Reserve and Spinning Reserve Requirements
    Xie, Jun
    Zheng, Yimin
    Pan, Xueping
    Zheng, Yuan
    Zhang, Liqin
    Zhan, Yongsheng
    IEEE ACCESS, 2021, 9 : 10765 - 10777