Whale Algorithm for Schedule Optimization of Construction Projects Employing Building Information Modeling

被引:0
|
作者
Golmaei, S. M. [1 ]
Vahidi, J. [2 ]
Jamshidi, Morteza [3 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, Sari Branch, Sari, Iran
[2] Iran Univ Sci & Technol, Dept Comp Sci, Tehran, Iran
[3] Islamic Azad Univ, Dept Civil Engn, Chalous Branch, Chalous, Iran
关键词
construction scheduling; design process; industry foundation classes (IFC); three-dimensional model; whale optimization algorithm; CONVECTIVE HEAT-TRANSFER; COOLING PERFORMANCE; FLUID-FLOW; NANOFLUID; SINKS; CONTROLLER; VIBRATION; MOTION;
D O I
10.1002/eng2.70022
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study introduces a new approach by applying the Whale Optimization Algorithm (WOA) to create construction schedules using geometric data from Building Information Modeling (BIM). The algorithm utilizes 3D model information to establish stability criteria, which are organized in a Directed Design Structure Matrix (DSM). These criteria are integrated into the WOA Fitness function to enhance the constructability of schedules, where each schedule is symbolized as a unique whale. Through iterative WOA computations, the approach consistently achieves maximum constructability scores starting from randomly generated schedules, affirming the efficacy of this method. The results reveal that the proposed algorithm effectively produced fully executable project schedules from diverse inputs. Despite variations in computational times due to different input parameters, the experiments verified the consistent generation of schedules that are 100% executable.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] Applying building information modeling to integrate schedule and cost for establishing construction progress curves
    Wang, Kun-Chi
    Wang, Wei-Chih
    Wang, Han-Hsiang
    Hsu, Pei-Yuan
    Wu, Wei-Hao
    Kung, Cheng-Ju
    AUTOMATION IN CONSTRUCTION, 2016, 72 : 397 - 410
  • [22] A bilevel whale optimization algorithm for risk management scheduling of information technology projects considering outsourcing
    Lu, Fuqiang
    Yan, Tongren
    Bi, Hualing
    Feng, Ming
    Wang, Suxin
    Huang, Min
    KNOWLEDGE-BASED SYSTEMS, 2022, 235
  • [23] Building Information Modeling for Transportation Projects
    不详
    BAUINGENIEUR, 2017, 92 : A34 - A34
  • [24] Modeling construction time in Spanish building projects
    Guerrero, Miguel A.
    Villacampa, Yolanda
    Montoyo, Andres
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 861 - 873
  • [25] Implementing building information modeling (BIM) for the success of geotechnical offshore construction projects: malaysian construction industry
    Waqar A.
    Othman I.
    Almujibah H.
    Hayat S.
    Quality & Quantity, 2024, 58 (2) : 1945 - 1970
  • [26] THE MALAYSIAN GOVERNMENT'S INITIATIVE IN USING BUILDING INFORMATION MODELING (BIM) IN CONSTRUCTION PROJECTS
    Latiffi, Aryani Ahmad
    Brahim, Juliana
    Mohd, Suzila
    Fathi, Mohamad Syazli
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 767 - 772
  • [27] Integrated building information modeling and blockchain system for decentralized progress payments in construction projects
    Khalid, Muhammad Asfund
    Hassan, Muhammad Usman
    Ullah, Fahim
    Ahmed, Khursheed
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024,
  • [28] Coevolution of relationship networks and resistance behaviors for building information modeling implementation in construction projects
    Shao, Shiting
    Cao, Dongping
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2024, 42 (05)
  • [29] Building information modeling (BIM) adoption for enhanced legal and contractual management in construction projects
    Alotaibi, Badr Saad
    Waqar, Ahsan
    Radu, Dorin
    Khan, Abdul M.
    Dodo, Yakubu
    Althoey, Fadi
    Almujibah, Hamad
    AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (07)
  • [30] Editorial for IJPM special issue on advances in building information modeling (BIM) for construction projects
    Mancini, Mauro
    Wang, Xiangyu
    Skitmore, Martin
    Issa, Raymond
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (04) : 656 - 657