Evaluation of internal environmental pollution in non-blasting tunnel construction and case study

被引:0
|
作者
Sun, Jianchun [1 ]
Yang, Shiyong [1 ]
Huang, Shengping [2 ]
Shang, Zhijiang [3 ]
Ling, Weihao [1 ]
机构
[1] Southwest Petr Univ, Sch Civil Engn & Geomat, Chengdu, Peoples R China
[2] Sichuan Yiyatang Decorat Design Engn Co Ltd, Headquarters, Chengdu, Peoples R China
[3] Chenglan Railway Co Ltd, Suining Command, Chengdu, Peoples R China
关键词
Non-blasting tunnel construction; Internal spatial environmental pollution; AHP-OWA; Grey clustering evaluation; HARD-ROCK TBM; CLUSTERING METHOD; EXPOSURE; PROSPECT; CITIES; DRILL; DUST;
D O I
10.1108/K-08-2024-2285
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
PurposeThis paper addresses the issue of internal spatial environmental pollution in non-blasting tunnel construction by proposing a comprehensive evaluation model. The model aims to provide a scientific basis for environmental pollution prevention in non-blasting tunnel construction, thereby facilitating green tunnel construction and sustainable development management.Design/methodology/approachThe study firstly refines and constructs the evaluation index system from the perspective of pollution sources. A novel weight calculation method is introduced by integrating the analytic hierarchy process (AHP) with the ordered weighted averaging (OWA) operator, and a comprehensive evaluation model for internal environmental pollution in non-blasting tunnels is established by incorporating the grey clustering evaluation method. Finally, an empirical study is conducted using the Erbaoshan Tunnel as a case study to verify the feasibility and effectiveness of the model.FindingsThe study develops an evaluation system for internal environmental pollution in non-blasting tunnels and applies it to the Erbaoshan Tunnel. The results classify the pollution level as "general pollution," confirming the rationality and applicability of the evaluation system and model while also identifying the primary pollution factors.Originality/valueThis study first developed a comprehensive evaluation system for environmental pollution in non-blasting tunnel construction from the pollution source perspective, making the system more comprehensive. Additionally, it innovatively combined AHP-OWA and gray clustering methods to scientifically assess pollution levels, providing valuable scientific guidance for the evaluation and management of non-blasting tunnels and similar underground projects.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] Evaluation of economic loss from energy-related environmental pollution:a case study of Beijing
    Chen CHEN
    Meirong SU
    Gengyuan LIU
    Zhifeng YANG
    Frontiers of Earth Science, 2013, 7 (03) : 320 - 330
  • [42] Evaluation of economic loss from energy-related environmental pollution: a case study of Beijing
    Chen Chen
    Meirong Su
    Gengyuan Liu
    Zhifeng Yang
    Frontiers of Earth Science, 2013, 7 : 320 - 330
  • [43] Evaluation of economic loss from energy-related environmental pollution: a case study of Beijing
    Chen, Chen
    Su, Meirong
    Liu, Gengyuan
    Yang, Zhifeng
    FRONTIERS OF EARTH SCIENCE, 2013, 7 (03) : 320 - 330
  • [44] Study and analysis of internal force induced by shield tunnel construction of adjacent structure
    Ding, Zhi
    Wei, Xin-Jiang
    Wei, Gang
    Li, Xiao-Zhen
    Yantu Lixue/Rock and Soil Mechanics, 2011, 32 (SUPPL. 1): : 749 - 754
  • [45] A Case Study of DSM Method Applied to Urban Tunnel Construction
    Lee, Hyung Jun
    Im, Jong-Chul
    Seo, Minsu
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (02): : 381 - 386
  • [46] The impact of digital inclusive finance on environmental pollution: A case study of air pollution
    Wang, Zexing
    Fan, Min
    Fan, Yaojun
    PLOS ONE, 2024, 19 (07):
  • [47] Case Study of Rehabilitation of a Damaged Underwater Tunnel in the Construction Phase
    Wang, Zhan
    Wang, Li-zhong
    Wang, Jin-chang
    Li, Ling-ling
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (01)
  • [48] ENVIRONMENTAL LOAD ESTIMATING MODEL FOR NATM TUNNEL USING CASE BASED REASONING IN THE PLANNING STAGE OF TUNNEL CONSTRUCTION
    Lee, Ju-hyun
    Kim, Kyong Ju
    Kim, Seok
    ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2019, 18 (06): : 1177 - 1191
  • [49] Blasting profile evaluation of sand-mud interbedded surrounding rock during the large-span tunnel construction
    Ma, Longhao
    Lin, Fei
    Du, Yanqiang
    Ren, Song
    Long, Nengzeng
    Zhang, Ping
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [50] Rockburst prediction and prevention in a deep-buried tunnel excavated by drilling and blasting: A case study
    Zhang, Qi
    Zhang, Xiao-Ping
    Liu, Quansheng
    Qiu, Junbo
    Wu, Jian
    ENGINEERING GEOLOGY, 2024, 330