共 50 条
- [42] Evaluation of economic loss from energy-related environmental pollution: a case study of Beijing Frontiers of Earth Science, 2013, 7 : 320 - 330
- [44] Study and analysis of internal force induced by shield tunnel construction of adjacent structure Yantu Lixue/Rock and Soil Mechanics, 2011, 32 (SUPPL. 1): : 749 - 754
- [45] A Case Study of DSM Method Applied to Urban Tunnel Construction ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (02): : 381 - 386
- [46] The impact of digital inclusive finance on environmental pollution: A case study of air pollution PLOS ONE, 2024, 19 (07):
- [48] ENVIRONMENTAL LOAD ESTIMATING MODEL FOR NATM TUNNEL USING CASE BASED REASONING IN THE PLANNING STAGE OF TUNNEL CONSTRUCTION ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2019, 18 (06): : 1177 - 1191
- [49] Blasting profile evaluation of sand-mud interbedded surrounding rock during the large-span tunnel construction SCIENTIFIC REPORTS, 2024, 14 (01):