Dynamic Tests of Pony Truss Railway Bridge Under Normal Operation

被引:0
|
作者
Pradelok, Stefan [1 ]
Poprawa, Grzegorz [1 ]
机构
[1] Silesian Tech Univ, Fac Civil Engn, Akad 5, PL-44100 Gliwice, Poland
关键词
Operational modal analysis; Railway bridge; Pony truss;
D O I
10.2478/acee-2024-0005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The article describes the application of dynamic tests during normal operation in assessing the technical condition of the railway bridge on the Nysa & Lstrok;u & zdot;ycka River. The investigated structure consists of six steel pony truss spans. Operational modal analysis was used to identify dynamic parameters. The results obtained were applied to verify the numerical model used in the assessment process of technical condition and in determining the current load capacity of the structure created in the 1950s. The experiment conducted allowed us to observe the dynamic response of the pony-truss bridges. The study demonstrated that dynamic tests during normal operation and the use of other available environmental excitations could complement other non-destructive diagnostic methods. This proves that we can obtain useful information about the dynamic properties of a structure without closing the traffic and without the application of the ordinary dynamic test load.
引用
收藏
页码:63 / 70
页数:8
相关论文
共 50 条
  • [31] Longitudinal Displacement Behavior and Girder End Reliability of a Jointless Steel-Truss Arch Railway Bridge during Operation
    Zhao, Hanwei
    Ding, Youliang
    Nagarajaiah, Satish
    Li, Aiqun
    APPLIED SCIENCES-BASEL, 2019, 9 (11):
  • [32] Dynamic performance analysis of steel truss bridge
    Wang, Shanshan
    Xu, Tao
    Qin, Sifeng
    Zhang, Yunjie
    APPLIED MATERIALS AND TECHNOLOGIES FOR MODERN MANUFACTURING, PTS 1-4, 2013, 423-426 : 1548 - 1551
  • [33] Calibration of the numerical model of a track section over a railway bridge based on dynamic tests
    Ribeiro, D.
    Calcada, R.
    Brehm, M.
    Zabel, V
    STRUCTURES, 2021, 34 : 4124 - 4141
  • [34] Study on Dynamic Characteristic of 64m Railway Steel Truss Bridge on the Different Speed of Train Loads
    Sun, Zhijie
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2135 - 2138
  • [35] Dynamic Tests of a Railway Viaduct
    Rodrigues, Jorge
    Ledesma, Maira
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, EURODYN 2011, 2011, : 1459 - 1466
  • [36] Dynamic Response of a New Railway Emergency Steel Truss Girder under the Moving Train Loads
    Zhang, Yaohui
    Wang, Hailong
    MANUFACTURING ENGINEERING AND AUTOMATION I, PTS 1-3, 2011, 139-141 : 2405 - +
  • [37] Instrumentation, truck, track and bridge on operation railway
    Montoya, R.
    Fernando Martha, L.
    Fernando Rodriguez, J.
    Merheb, A.
    Sisdelli, A.
    Masini, F.
    LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 3097 - 3102
  • [38] Dynamic Performance of Typical Steel Truss-Railway Bridges under the Action of Moving Trains
    Tao, Tianyou
    Wang, Hao
    Hu, Suoting
    Zhao, Xinxin
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2018, 32 (04)
  • [39] COMPOSITE DECK IN TWO-DIMENSIONAL MODELLING OF RAILWAY TRUSS BRIDGE
    Siekierski, Wojciech
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2014, 9 (02): : 115 - 122
  • [40] Condition assessment and retrofit of a historic steel-truss railway bridge
    Spyrakos, CC
    Raftoyiannis, IG
    Ermopoulos, JC
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2004, 60 (08) : 1213 - 1225