Main cable structure analysis and construction control of short span suspension bridge within three-tower

被引:0
|
作者
Shah, Yasir Ibrahim [1 ]
Hu, Zhijian [1 ]
Huang, Jianwei [2 ,3 ]
机构
[1] Wuhan Univ Technol, Sch Transportat & Logist Engn, Rd & Bridge Engn Dept, Wuhan, Hubei, Peoples R China
[2] CCCC Highway Bridge Natl Engn Res Ctr Co Ltd, Wuhan, Hubei, Peoples R China
[3] CCCC Second Harbor Engn Co Ltd, Wuhan, Hubei, Peoples R China
关键词
Short-span suspension bridge; Main cable structure; Construction control; Elastic modulus deviation of the main cable; Pre-deflection of cable saddle; Effect of temperature; ELEMENT; DESIGN;
D O I
10.1016/j.istruc.2024.107417
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Feng Chu suspension bridge in Xiangyang holds the distinction of having one of the shortest span lengths among global suspension bridges, measuring less than half the length of conventional designs. This paper focuses on the engineering background of the bridge and delves into the analysis of the main cable structure and construction control methods for short-span suspension bridges with three towers. The study examines the impact of elastic modulus deviation in the main cable and the dead-load error of the stiffening beam on key parameters such as the unstressed length of the main cable, pre-deflection of the cable saddle, and mid-span elevation of the empty cable. Additionally, the effects of temperature, span, and cable length on the sag of the empty cable during the erection process are analyzed. Findings reveal that the elastic modulus and dead-load error significantly influence the unstressed length of the main cable, pre-deflection of the saddle, and the shape of the empty cable. This study establishes a relationship between changes in cable length and mid-span sag, providing valuable theoretical guidance for aligning and adjusting the main cable strands. Furthermore, synchronized alignment adjustments for the two mid-span sections are proposed to prevent main cable strand sliding, which may occur due to significant differences in sag between the sections.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Gravity stiffness of a three-tower suspension bridge: Analytical solution via double-span bridge reduction to a single-span one with elastic constraints
    Zhang, Wen-ming
    Yang, Chao-yu
    Chang, Jia-qi
    Li, Dong-min
    Liu, Zhao
    STRUCTURES, 2021, 33 : 2198 - 2207
  • [32] Seismic performance and its favorable structural system of three-tower suspension bridge
    Zhang, Xin-Jun
    Fu, Guo-Ning
    STRUCTURAL ENGINEERING AND MECHANICS, 2014, 50 (02) : 215 - 229
  • [33] Selection of a Structural System for a Three-Tower Suspension Bridge of Maanshan Yangtze River Highway Bridge
    Zhang Qiang
    Tang He-qiang
    Yang Guang-wu
    STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 139 - 143
  • [34] INVESTIGATION ON THE WIND STABILITY OF A THREE-TOWER SUSPENSION BRIDGE DURING DECK ERECTION
    Zhang, Xin-Jun
    Wu, Li-Bing
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOL I AND II, 2010, : 1483 - 1488
  • [35] Cable tension control in anchorage span of suspension bridge
    Xu, Han-Zheng
    Huang, Ping-Ming
    Xi'an Gonglu Jiaotong Daxue Xuebao/Journal of Xi'an Highway University, 2002, 22 (05):
  • [36] Influence law of Middle Tower on Mechanical Performance of Three-Tower Self-anchored Suspension Bridge
    Zhang, Chao
    Chen, Yong-jian
    Fang, Zhen-zheng
    Wu, Sheng-ping
    ADVANCES IN APPLIED MATERIALS AND ELECTRONICS ENGINEERING II, 2013, 684 : 134 - 138
  • [37] Vibration control of steel tower of large span cable-stayed bridge under construction
    State Key Laboratory for Disaster Reduction of Civil Engineering, Tongji University, Shanghai 200092, China
    1600, 1152-1158 (September 2006):
  • [38] Behaviour and design of three-tower, self-anchored suspension bridge with a concrete girder
    Pan, Shengshan
    Cui, Yao
    Zhang, Zhe
    Zhu, Weizhi
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (03) : 190 - 203
  • [39] Study on structural system selection of three-tower long-span cable-stayed bridge with high piers under earthquake
    Xu, Xiangdong
    Wei, Biao
    Ma, Baihu
    Du, Bin
    Liu, Xingmao
    Wei, Biao (weibiao@csu.edu.cn), 1743, Central South University Press (17): : 1743 - 1750
  • [40] Shape Analysis of Main Cable of Single Tower Suspension Bridge with Unilateral Spatial Cable Plane and Curved Beam
    Yang Y.
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2024, 59 (02): : 298 - 306