Performance of Real-Time Hybrid Simulation for Hunting Dampers of High-Speed Trains

被引:0
|
作者
Wang, Zhen [1 ,2 ]
Xiao, Jiajun [1 ,2 ]
Zhang, Baoan [3 ]
Yang, Ge [1 ,2 ]
Wu, Bin [1 ,2 ]
Jia, Xuejun [4 ]
机构
[1] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[2] Wuhan Univ Technol, Hainan Inst, Sanya 572000, Peoples R China
[3] CRRC Qingdao Sifang Co Ltd, Qingdao 266111, Peoples R China
[4] Nanjing Technol Univ, Coll Transportat Engn, Nanjing 211899, Peoples R China
来源
STRUCTURAL CONTROL & HEALTH MONITORING | 2024年 / 2024卷 / 01期
基金
中国国家自然科学基金;
关键词
critical speed; high-speed train; hunting damper; hunting stability; real-time hybrid simulation; time-delay compensation; RAILWAY VEHICLE; COMPENSATION METHOD; DELAY COMPENSATION; STABILITY; DYNAMICS; SYSTEM; BRIDGE; MODEL;
D O I
10.1155/stc/4984025
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
One favorable solution to the issue of hunting instability of high-speed trains is to install hunting dampers. However, the nonlinearity of dampers and their interaction with a train present significant challenges in accurately analyzing the dynamic behaviors of both dampers and trains. To address these challenges, we present and investigate a real-time hybrid simulation (RTHS) for hunting dampers of high-speed trains and propose an improved two-stage adaptive time-delay compensation method to resolve its demanding delay issue. This innovative approach combines a numerical train model with a full-scale physical hunting damper, providing a versatile method for simulating and analyzing various dynamic behaviors. The train model incorporates 17 degrees of freedom and accounts for the nonlinear wheel-rail contact relationship to more faithfully represent the dynamic response of the train. A virtual RTHS platform with a loading system model has been developed. Both numerical simulations on this platform and real tests are conducted using the RTHS approach. Results demonstrate that time delays can reduce the hunting stability of a high-speed train, and the improved two-stage adaptive time-delay compensation method outperforms other comparative methods. This research reveals the feasibility and efficacy of the RTHS method for hunting dampers of high-speed trains.
引用
收藏
页数:21
相关论文
共 50 条
  • [41] Processing high-speed intelligence feeds in real-time
    Demers, A
    Gehrke, J
    Hong, MS
    Riedewald, M
    INTELLIGENCE AND SECURITY INFORMATICS, PROCEEDINGS, 2005, 3495 : 617 - 618
  • [42] INVESTIGATION OF THE TRUCK HUNTING INSTABILITY PROBLEM OF HIGH-SPEED TRAINS.
    Clark, James W.
    Law, E.Harry
    1972,
  • [43] Real-time temperature monitoring in high-speed photopolymerization
    Decker, C
    Decker, D
    Morel, F
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1996, 211 : 207 - PMSE
  • [44] Real-time intrusion detection for high-speed networks
    Jiang, WB
    Song, H
    Dai, YQ
    COMPUTERS & SECURITY, 2005, 24 (04) : 287 - 294
  • [45] REAL-TIME TRAFFIC MEASUREMENTS FOR HIGH-SPEED NETWORKS
    HERSHEY, PC
    SILIO, CB
    WACLAWSKY, JG
    BT TECHNOLOGY JOURNAL, 1995, 13 (03): : 113 - 122
  • [46] A High-Speed Real-Time Binary BCH Decoder
    Wei, Shyue-Win
    Wei, Che-Ho
    IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS FOR VIDEO TECHNOLOGY, 1993, 3 (02) : 138 - 147
  • [47] High-speed and real-time measurement of stokes parameters
    Qin, Zhaoyu
    Cheng, Zhaogu
    Zhang, Zhiping
    Zhu, Jianqiang
    Guangxue Xuebao/Acta Optica Sinica, 2007, 27 (04): : 659 - 662
  • [48] HIGH-SPEED REAL-TIME NDT INSPECTION SYSTEMS
    PAGANO, DA
    NORRIS, JR
    RUBOCKI, J
    MATERIALS EVALUATION, 1993, 51 (11) : 1271 - 1272
  • [49] Influence of steady aerodynamic loads on hunting stability of high-speed trains
    Zhang, Heng
    Ling, Liang
    Zhai, Wanming
    NONLINEAR DYNAMICS, 2025, 113 (03) : 2155 - 2181
  • [50] Moving Safety Evaluation of High-speed Train on Post-earthquake Bridge Utilizing Real-time Hybrid Simulation
    Guo, Wei
    Wang, Yang
    Zeng, Chen
    Wang, Tao
    Gu, Quan
    Zhou, Huimeng
    Zhou, Lingyu
    Hou, Wenqi
    JOURNAL OF EARTHQUAKE ENGINEERING, 2023, 27 (02) : 284 - 313