A numerical investigation into the behaviour of cable-stayed bridges under deck explosions

被引:0
|
作者
Abdel-Fattah, Mohamed T. [1 ]
Abdel-Fattah, Tarek T. [2 ]
机构
[1] Infra Sol Engn, Cairo, Egypt
[2] Housing & Bldg Natl Res Ctr, Giza, Egypt
关键词
Blast loads; cable failure mitigation; cable-stayed bridges; finite-element modelling; geometric nonlinearity; material nonlinearity; progressive failure; time-history analysis; DYNAMIC-RESPONSE; BLAST; PERFORMANCE;
D O I
10.1080/15732479.2024.2438732
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper explores the behaviour of cable-stayed bridges (CSBs) when subjected to intentional explosion events. An example CSB was proposed and analysed using a three-dimensional (3D) finite-element (FE) model; a nonlinear time-history analysis taking into account the geometric and material nonlinearities was conducted. Six blast scenarios were considered; the explosion took place on the bridge deck. Response quantities, such as forces in cables, movements of deck and pylons, states of stress in main girders, and reactions on bearings and pylon foundations were examined. The critical blast scenario for each of these quantities was identified. Some design measures for mitigating cable failure were proposed and examined. The results of analyses showed that considering several blast scenarios for the design and evaluation of CSBs is mandatory. Non-symmetric (relative to the bridge longitudinal axis) blast loading scenarios are generally more critical than symmetric ones. Increasing the area of some long cables in the main span, and increasing spacing of the cables nearby the pylon together with strengthening the main girder nearby the pylon could be useful measures to reduce failure potential. This study may help better understand the response of CSBs to extreme events.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Unconventional cable-stayed bridges: structural behaviour and design criteria
    Ruiz-Teran, A. M.
    STRUCTURAL CONCRETE, 2010, 11 (01) : 25 - 34
  • [42] Mechanism of longitudinal cracking in concrete deck slabs of composite cable-stayed bridges
    Liang, Chen
    Zhao, Changjun
    Liu, Yuqing
    ENGINEERING STRUCTURES, 2025, 327
  • [43] Influence of Cable Dampers on Cable-Stayed Bridges
    Liang, Dong
    Shen, Huicai
    Li, Yanfeng
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1474 - 1479
  • [44] Experimental and numerical investigation on the static and dynamic behaviors of cable-stayed bridges with CFRP cables
    Xie, Gui-hua
    Yin, Jie
    Liu, Rong-gui
    Chen, Bei
    Cai, Dong-sheng
    COMPOSITES PART B-ENGINEERING, 2017, 111 : 235 - 242
  • [45] Ultimate Load Capacity of Cable-Stayed Bridges with Different Deck and Pylon Connections
    Xi, Zhuo
    Xi, Ying
    Xiong, Huiting
    JOURNAL OF BRIDGE ENGINEERING, 2014, 19 (01) : 15 - 33
  • [46] EFFECT OF CABLE STIFFNESS ON CABLE-STAYED BRIDGES
    KRISHNA, P
    ARYA, AS
    AGRAWAL, TP
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1985, 111 (09): : 2008 - 2020
  • [47] Optimization of Cable Tensioning in Cable-Stayed Bridges
    Janjic, D.
    Pircher, M.
    Pircher, H.
    JOURNAL OF BRIDGE ENGINEERING, 2003, 8 (03) : 131 - 137
  • [48] Influence of cable dampers on cable-stayed bridges
    Liang, Dong
    Kong, Dandan
    Li, Yanfeng
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2014, 167 (04) : 293 - 302
  • [49] Optimization of cable preloading on cable-stayed bridges
    Wang, YC
    Vlahinos, AS
    Shu, HS
    SMART SYSTEMS FOR BRIDGES, STRUCTURES, AND HIGHWAYS - SMART STRUCTURES AND MATERIALS 1997, 1997, 3043 : 248 - 259
  • [50] Cable painting robot for cable-stayed bridges
    Zhang, Jialiang
    Lu, Tiansheng
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2007, VOLS 1 AND 2, 2007, : 611 - 616