Predicting tunnel boring machine performance with the Informer model: a case study of the Guangzhou Metro Line project

被引:0
|
作者
Zhao, Junxing [1 ]
Ding, Xiaobin [1 ,2 ]
机构
[1] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou 510641, Peoples R China
[2] South China Univ Technol, Guangdong Prov Key Lab Modern Civil Engn Technol, Guangzhou 511442, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Boring machine performance; Informer model; Deep learning; Thrust force; TBM(sic)(sic); Informer(sic)(sic); (sic)(sic)(sic)(sic); (sic)(sic); TBM PERFORMANCE; ROCK;
D O I
10.1631/jzus.A2400012
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Accurately forecasting the operational performance of a tunnel boring machine (TBM) in advance is useful for making timely adjustments to boring parameters, thereby enhancing overall boring efficiency. In this study, we used the Informer model to predict a critical performance parameter of the TBM, namely thrust. Leveraging data from the Guangzhou Metro Line 22 project on the big data platform in China, the model's performance was validated, while data from Line 18 were used to assess its generalization capability. Results revealed that the Informer model surpasses random forest (RF), extreme gradient boosting (XGB), support vector regression (SVR), k-nearest neighbors (KNN), back propagation (BP), and long short-term memory (LSTM) models in both prediction accuracy and generalization performance. In addition, the optimal input lengths for maximizing accuracy in the single-time-step output model are within the range of 8-24, while for the multiple-time-step output model, the optimal input length is 8. Furthermore, the last predicted value in the case of multiple-time-step outputs showed the highest accuracy. It was also found that relaxation of the Pearson analysis method metrics to 0.95 improved the performance of the model. Finally, the prediction results were most affected by earth pressure, rotation speed, torque, boring speed, and the surrounding rock grade. The model can provide useful guidance for constructors when adjusting TBM operation parameters. (sic) (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic) (TBM) (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic). (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic) TBM (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic),(sic)(sic),(sic)(sic),(sic)(sic)(sic)(sic),(sic)(sic),(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic),(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)TBM(sic)(sic)(sic)(sic)(sic)(sic)(sic).(sic)(sic)(sic)1. (sic)(sic)(sic)(sic)(sic) TBM (sic)(sic)(sic) Informer (sic)(sic)(sic)(sic); 2. (sic)(sic)(sic)(sic)(sic)(sic)(sic)7(sic)(sic)(sic)(sic)(sic)TBM(sic)(sic); 3. (sic)(sic)(sic) Informer (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic); 4. (sic)(sic)(sic)(sic) Informer (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic).(sic) (sic)1. (sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic); 2. (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic) TBM (sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic); 3. (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic); 4. (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic) TBM (sic)(sic)(sic)(sic)(sic)(sic)(sic).(sic) (sic)1. (sic)(sic)(sic)(sic),(sic)(sic)(sic)(sic)(sic)(sic)(sic),(sic)(sic)(sic)(sic)(sic),K(sic)(sic),(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic); (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic). 2. (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic); (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic); (sic)(sic)(sic)(sic)(sic)(sic), 8 (sic) 24 (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic) 8 (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic); (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic) 0.99 (sic) 0.98. 3. (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic),(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic). 4. (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic) 0.80 (sic)(sic)(sic) 0.95; (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic). 5. (sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic),(sic)(sic)(sic),(sic)(sic)(sic)(sic)(sic)(sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic) 0.95; (sic)(sic), (sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic)(sic) ((sic)(sic)(sic)(sic)(sic)(sic)0.77).
引用
收藏
页码:226 / 237
页数:12
相关论文
共 50 条
  • [41] Construction and application of Spatial density evaluation model for Metro station: A case study of Tianjin Metro Line 3
    He Menglin
    Yan Jianwei
    Du Lintao
    PRAXIS OF URBAN MORPHOLOGY, PT 2, 2023, : 847 - 859
  • [42] Tunnel boring machines (TBM) performance prediction: A case study using big data and deep learning
    Shangxin, Feng
    Zuyu, Chen
    Hua, Luo
    Shanyong, Wang
    Yufei, Zhao
    Lipeng, Liu
    Daosheng, Ling
    Liujie, Jing
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 110
  • [43] Ground deformation induced by a shallow-buried twin-tunnel with small spacing: a case study of Guangzhou Metro Line 18 excavated by earth-pressure balance TBM
    Zhang, Qi
    Zhang, Xiao-Ping
    Wang, Hao-Jie
    Zhang, Xin-Yue
    Li, Fang-Yi
    Xu, Dan
    ENVIRONMENTAL EARTH SCIENCES, 2023, 82 (12)
  • [44] Ground deformation induced by a shallow-buried twin-tunnel with small spacing: a case study of Guangzhou Metro Line 18 excavated by earth-pressure balance TBM
    Qi Zhang
    Xiao-Ping Zhang
    Hao-Jie Wang
    Xin-Yue Zhang
    Fang-Yi Li
    Dan Xu
    Environmental Earth Sciences, 2023, 82
  • [45] TBM Performance Prediction Using Statistical and Machine Learning Algorithms: Case Study of Slurry TBM Used in Mumbai Metro Rail Tunnel Line-3 (UGC-03), India
    Kullarkar, Shubham D.
    Thote, N. R.
    JOURNAL OF THE GEOLOGICAL SOCIETY OF INDIA, 2025, 101 (02) : 149 - 162
  • [46] Safe excavation of large section tunnels with Earth Pressure Balance Tunnel Boring Machine in gassy rock masses: The Sparvo tunnel case study
    Bandini, Annalisa
    Berry, Paolo
    Cormio, Carlo
    Colaiori, Marco
    Lisardi, Andrea
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 67 : 85 - 97
  • [47] Calculation of Optimum Soil Conditioning in EPB Tunneling (Case Study: Ahwaz Metro Project, Line 1)
    Masoumi, Hamid-Reza Pasand
    Abdollahipour, Abolfazl
    Bagherinia, Khosrow
    JOURNAL OF MINING AND ENVIRONMENT, 2021, 12 (02): : 501 - 513
  • [48] Flood resilience assessment of metro station entrances based on the PSR model framework: A case study of the Donghaochong Basin, Guangzhou
    Zhang, Zezhong
    Huang, Guoru
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2024, 366
  • [49] A comparative study of different machine learning algorithms in predicting EPB shield behaviour: a case study at the Xi'an metro, China
    Bai, Xue-Dong
    Cheng, Wen-Chieh
    Li, Ge
    ACTA GEOTECHNICA, 2021, 16 (12) : 4061 - 4080
  • [50] A comparative study of different machine learning algorithms in predicting EPB shield behaviour: a case study at the Xi’an metro, China
    Xue-Dong Bai
    Wen-Chieh Cheng
    Ge Li
    Acta Geotechnica, 2021, 16 : 4061 - 4080