Study on the disturbance law of the new viaduct pile foundation construction to the subway in the adjacent operation

被引:0
|
作者
Cheng, Cheng [1 ]
Zheng, Shuai [1 ]
Wang, Zhongchang [2 ]
Bian, Wenrui [2 ]
Pang, Yanzhi [3 ]
机构
[1] Dalian Jiaotong Univ, Sch Transportat Engn, Dalian 116028, Peoples R China
[2] Dalian Jiaotong Univ, High speed Railway Tech Engn Res Ctr High cold Are, Dalian 116028, Liaoning, Peoples R China
[3] Nanning Univ, Guangxi Key Lab Int Join China ASEAN Comprehens Tr, Nanning 530200, Peoples R China
来源
ENGINEERING RESEARCH EXPRESS | 2024年 / 6卷 / 04期
关键词
pile construction; numerical simulation; subway station; disturbance law; security control; TUNNEL;
D O I
10.1088/2631-8695/ad970b
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
During the construction of elevated bridge pile foundations, the mechanical processes, including the extrusion and friction caused by the steel casing's rotation into the soil and the soil pressure unloading due to soil extraction from pile holes, can significantly disturb existing structures. To address the engineering challenge posed by the planned elevated bridge on Yuanjiang Street Expressway in Shenyang, which is adjacent to the operational Metro Line 10 Dingxianghu Station, this study investigates the disturbance laws of the pile foundation construction on the mechanical behavior of the subway station. A three-dimensional finite element model of the target project was constructed, and numerical simulations were conducted, with a focus on the stress transfer phenomenon caused by friction between the casing and the soil during rotary excavation. The disturbance laws of pile foundation construction on the nearby operating metro structure and the surrounding soil under different excavation sequences were analyzed. The results indicate that the extent of soil settlement is inversely proportional to the distance from the pile foundation; the maximum compressive stress on the top of the station is 2.23 MPa, and the maximum tensile stress at the bottom is 1.31 MPa. The disturbances to the subway station caused by symmetrical drilling, row drilling, and skip pile drilling decrease in that order. The maximum lateral displacement of the subway station is reduced by 57.2% and 26.6% compared to the case without changing the excavation sequence. The study provides insights into the disturbance laws caused by the mechanical transmission path formed by soil friction during the rotary excavation of new elevated bridge pile foundations near operating subway station, offering theoretical reference for future similar engineering projects.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Study on the influence of deep foundation pit excavation on the deformation of adjacent viaduct pile foundation
    Wang, Haitao
    Xu, Mingyang
    Guo, Tao
    Cui, Minghua
    Tian, Jiangtao
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2024, 20 (03) : 288 - 307
  • [2] Study on the mechanical behavior of a foundation pit retaining structure adjacent to the pile foundation of a subway station
    Zhang, Qian
    Hu, Jie
    Wang, Jing
    He, Peng
    Hou, Lili
    Lin, Peng
    Song, Shuguang
    ENVIRONMENTAL EARTH SCIENCES, 2021, 80 (20)
  • [3] Study on the mechanical behavior of a foundation pit retaining structure adjacent to the pile foundation of a subway station
    Qian Zhang
    Jie Hu
    Jing Wang
    Peng He
    Lili Hou
    Peng Lin
    Shuguang Song
    Environmental Earth Sciences, 2021, 80
  • [4] Study on the Optimal Construction Time of Adjacent Pile Foundation Considering the Thermal Stability of the Existing Pile Foundation
    Shi, Xiangyang
    Wang, Yunxing
    Zhou, Ziqiang
    Huang, Long
    BUILDINGS, 2025, 15 (05)
  • [5] Analysis of the Influence of Deep Foundation Excavation on Adjacent Viaduct Pile Foundation Considering Train Dynamic Loads
    Bao, Xiaohua
    Cheng, Zilong
    Lv, Chuang
    Shen, Jun
    Chen, Xiangsheng
    Cui, Hongzhi
    APPLIED SCIENCES-BASEL, 2023, 13 (03):
  • [6] Study on Influence Mechanism of Tunnel Construction on Adjacent Pile Foundation and Resilience Assessment
    Zhou, Jun
    Han, Kaihang
    Chen, Weitao
    BUILDINGS, 2024, 14 (09)
  • [7] Research on the Disturbance Law on the Cable Tunnel Induced by the Foundation Pit Construction of Pile Enclosing Structure
    Duan, Zhiguo
    Li, Qian
    Zhang, Kaixuan
    Li, Wenjiang
    2021 4th International Symposium on Traffic Transportation and Civil Architecture, ISTTCA 2021, 2021, : 515 - 520
  • [8] Study on the influence of the in-tunnel underpinning construction of the subway tunnel in the soft ground on the pile foundation
    Chen, Xinlei
    Zhang, Xuemin
    Zhao, Yong
    Liu, Jiqiang
    Yu, Wei
    Zhou, Xianshun
    Dong, Zonglei
    Journal of Railway Science and Engineering, 2021, 18 (12) : 3294 - 3302
  • [9] Study on Underpinning Scheme of Shield Tunnel Crossing Pile Foundation of Viaduct
    Zhang, Liangliang
    Liu, Yan
    Wang, Yidi
    2019 5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING (ICAESEE 2019), 2020, 446
  • [10] COLLINEAR FORCE AND FREQUENCY ANALYSIS OF A VIADUCT PILE FOUNDATION CONSTRUCTION PROJECT: A CASE STUDY ON THE APPLICATION OF BIM TECHNOLOGY
    Doumbouya, Lancine
    Guan, Changsheng
    Deng, Sixiang
    Gao, Guoping
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE: ENGINEERING FOR RURAL DEVELOPMENT, 2016, : 1003 - 1011