共 50 条
- [41] UNDERSTANDING COST ESCALATION IN NUCLEAR REACTOR CONSTRUCTION PROJECTS PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON PROJECT EVALUATION (ICOPEV 2016), 2016, : 133 - 137
- [43] Fast-track, low-cost construction starts with the owner Power Engineering (Barrington, Illinois), 1992, 96 (02): : 19 - 23
- [44] Development of target cost By the owner or together with Contractors - Target Value Design INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES 2020 (CENTERIS/PROJMAN/HCIST 2020), 2021, 181 : 1171 - 1178
- [45] Owner Time and Cost Contingency Estimation for Building Construction Projects in Egypt CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 367 - 377
- [46] Testing of Owner Estimate Cost Model with Android-based Application 2019 3RD INTERNATIONAL CONFERENCE ON INFORMATICS AND COMPUTATIONAL SCIENCES (ICICOS 2019), 2019,