LATINA POWER STATION.

被引:0
|
作者
De Falco, F.
机构
来源
Nuclear Energy | 1981年 / 20卷 / 02期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
NUCLEAR POWER PLANTS
引用
收藏
页码:165 / 172
相关论文
共 50 条
  • [31] GEOTECHNICAL ENGINEERING ASPECTS OF MATIMBA POWER STATION.
    Oosthuizen, A.P.C.
    Vanderstraeten, A.T.
    Solesbury, F.W.
    Civil engineer in South Africa, 1987, 29 (07): : 249 - 265
  • [32] NEW ZEALAND'S CYLDE POWER STATION.
    Hatton, J.W.
    Black, J.C.
    Foster, P.F.
    International Water Power and Dam Construction, 1987, 39 (12): : 15 - 20
  • [33] Modern Control Engineering in an Industrial Power Station.
    Schoch, G.
    Deutschlaender, D.
    Brennstoff-Waerme-Kraft, 1987, 39 (09): : 387 - 391
  • [34] BOILER SUPPORT STRUCTURE OF MATIMBA POWER STATION.
    Busch, Walter
    Civil engineer in South Africa, 1987, 29 (07): : 263 - 265
  • [35] Design and Construction of Gundremmingen Nuclear Power Station.
    Liersch, G.
    VGB-Kraftwerkstechnik, 1981, 61 (01): : 25 - 31
  • [36] Solution of Problems at Lingen Nuclear Power Station.
    Deublein, O.
    VGB Kraftwerkstechnik, 1976, 56 (01): : 13 - 17
  • [37] Upgrading of latschau power station. Kaplan turbines
    Holzer, W.
    Schedler, E.
    International Water Power and Dam Construction, 1994, 46 (02): : 28 - 29
  • [38] CONDENSATE POLISHING AT SURRY NUCLEAR POWER STATION.
    McNea, D.A.
    Siegwarth, D.P.
    Friedman, K.A.
    Sawochka, S.G.
    Electric Power Research Institute (Report) EPRI NP, 1983, (3037):
  • [39] FEASIBILITY STUDY OF A SATELLITE SOLAR POWER STATION.
    Glaser, Peter E.
    Maynard, Owen E.
    Mackovciak Jr., John
    Ralph, Eugene L.
    NASA Contractor Reports, 1974,
  • [40] Improved calculating cleaning in the Rheinfelden power station.
    Haas, R
    Bitterli
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1926, 70 : 1483 - 1485