LEARNING CURVE MODELS OF CONSTRUCTION PRODUCTIVITY.

被引:0
|
作者
Thomas, H.Randolph [1 ]
Mathews, Cody T. [1 ]
Ward, James G. [1 ]
机构
[1] Pennsylvania State Univ, University, Park, PA, USA, Pennsylvania State Univ, University Park, PA, USA
来源
| 1600年 / 112期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
CONSTRUCTION INDUSTRY
引用
收藏
相关论文
共 50 条
  • [31] MAJOR ADVANCES IN VERSATILITY AND PRODUCTIVITY.
    Anon
    Textile Month, 1984, : 37 - 39
  • [32] Business Productivity. Conditioning Factors
    Busfos Flores, Carlos Enrique
    VISION GERENCIAL, 2022, 21 (02): : 317 - 326
  • [33] Multinational firms, innovation and productivity.
    Meschi, Elena
    INTERNATIONAL LABOUR REVIEW, 2006, 145 (04) : 373 - 379
  • [34] Automating the Use of Learning Curve Models in Construction Task Duration Estimates
    Srour, F. Jordan
    Kiomjian, Daoud
    Srour, Issam M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (07)
  • [35] INTEGRATION - KEY TO CONTROL AND PRODUCTIVITY.
    Maskell, Brian
    Manufacturing Systems, 1986, 4 (03): : 52 - 53
  • [36] Medical care output and productivity.
    Street, A
    ECONOMIC JOURNAL, 2002, 112 (480): : F364 - F366
  • [37] ROBOTIC PALLETIZER BOOSTS PRODUCTIVITY.
    Anon
    Robotics World, 1987, 5 (11): : 39 - 40
  • [38] MANAGING FOR IMPROVED FOUNDRY PRODUCTIVITY.
    Krueger, Lawrence S.
    1600, (23):
  • [39] MOLDING 'MAPS' - GUIDELINES TO PRODUCTIVITY.
    Anon
    Automotive Plastics, 1977, 35 (05): : 63 - 65
  • [40] Learn Curve for Precast Component Productivity in Construction
    Tai, Hsing-Wei
    Chen, Jieh-Haur
    Cheng, Jiun-Yao
    Hsu, Shu-Chien
    Wei, Hsi-Hsien
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2021, 19 (10) : 1179 - 1194