共 22 条
- [1] COMPUTER CONTROL SYSTEM OF THE NEW MEDIUM SEAMLESS TUBE MILL AT THE KEIHIN WORKS. Nippon Kokan technical report overseas, 1986, (46): : 70 - 78
- [2] ADVANCED AUTOMATION ON THE NEW PLATE MILL AT MIZUSHIMA WORKS. Iron and Steel Engineer, 1978, 55 (10): : 34 - 40
- [3] FULL COMPUTER CONTROL OF PLATE MILL - OUTLINE OF THE PLATE MILL CONTROL SYSTEM AT OITA WORKS. Nippon Steel Technical Report, 1979, (14): : 120 - 137
- [4] CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT FACILITIES AT MIZUSHIMA WORKS. Kawasaki Steel Technical Report, 1987, (17): : 9 - 17
- [5] WATER TREATMENT SYSTEM FOR THE SEAMLESS MILL AT USS FAIRFIELD WORKS. Iron and Steel Engineer, 1988, 65 (07): : 26 - 28
- [6] RENEWAL AND OPERATION OF MAIN FACILITIES AT KASHIMA PLATE MILL. Sumitomo Metals, 1988, 40 (01): : 71 - 80
- [7] CONSTRUCTION AND OPERATION OF HOT METAL TREATMENT IN KEIHIN-WORKS, NIPPON-KOKAN-KK TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S271 - S271
- [8] HEAVY PLATE MILL OVERALL MANAGEMENT AND CONTROL SYSTEM AT NIPPON STEEL CORPORATION, OITA WORKS. Toshiba Review (International Edition), 1979, (120): : 20 - 26
- [9] SECONDARY TREATMENT FACILITIES AT A NORTHERN NEWSPRINT MILL - DESIGN AND OPERATION TAPPI, 1979, 62 (01): : 69 - 71
- [10] NEW DEVELOPMENTS IN ROD MILLS. PART II - OPERATION OF A SPECIALTY STEEL WIRE ROD FINISHING MILL AT TOYAMA WORKS. Iron and Steel Engineer, 1986, 63 (12): : 41 - 46