LICENSING COAL-FIRED POWER PLANTS.

被引:0
|
作者
Calvert, John R.
机构
来源
关键词
D O I
暂无
中图分类号
TM62 [发电厂];
学科分类号
摘要
A variety of state, local and federal regulations require fossil power plants to obtain a series of permits to allow siting, construction and operation - a form of licensing. For example, regulatory requirements generally control the data when construction may proceed and also may have a major impact upon the engineering schedule. Depending upon the type of development proposed and the project location, the licensing process could take 33 to 48 months from the selection of a site to the start of construction. If a viable site has not been defined, these periods would be extended by up to 12 months to accommodate a site selection study.
引用
收藏
页码:34 / 42
相关论文
共 50 条
  • [41] Mercury Removal Characteristics of Coal-Fired Power Plants
    Yang Liguo
    Fan Xiaoxu
    DuanYufeng
    Wang Yunjun
    2013 THIRD INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEM DESIGN AND ENGINEERING APPLICATIONS (ISDEA), 2013, : 930 - 933
  • [42] Alberta mercury regulation for coal-fired power plants
    Valupadas, Prasad
    FUEL PROCESSING TECHNOLOGY, 2009, 90 (11) : 1339 - 1342
  • [43] Review of transition paths for coal-fired power plants
    Song, Fulong
    Mehedi, Hasan
    Liang, Caihao
    Meng, Jing
    Chen, Zhengxi
    Shi, Fang
    GLOBAL ENERGY INTERCONNECTION-CHINA, 2021, 4 (04): : 354 - 370
  • [44] Identifying coal-fired power plants for early retirement
    Maamoun, Nada
    Kennedy, Ryan
    Jin, Xiaomeng
    Urpelainen, Johannes
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2020, 126 (126):
  • [45] Spatial distribution of coal-fired power plants in China
    Xie, Lunyu
    Huang, Ying
    Qin, Ping
    ENVIRONMENT AND DEVELOPMENT ECONOMICS, 2018, 23 (04) : 495 - 515
  • [46] STUDY FOR DECOMMISSIONING COAL-FIRED POWER-PLANTS
    WILSON, RD
    POWER ENGINEERING, 1984, 88 (08) : 38 - 41
  • [47] Coal-fired power plants: Imprudent investments? Response
    Morgan, M. Granger
    SCIENCE, 2007, 315 (5820) : 1792 - 1792
  • [48] Vietnam Reconsiders New Coal-Fired Power Plants
    不详
    POWER, 2016, 160 (04) : 8 - 8
  • [49] Architecture and design of smart coal-fired power plants
    Bao, Xiding
    Mao, Xiangyun
    Liu, Xinfcng
    Chcn, Hao
    Wang, Zhcnkc
    Zheng, Xiaoyong
    2022 IEEE INTERNATIONAL CONFERENCE ON CYBORG AND BIONIC SYSTEMS, CBS, 2022, : 419 - 423
  • [50] Mercury policy and regulations for coal-fired power plants
    Rallo, Manuela
    Lopez-Anton, M. Antonia
    Contreras, M. Luisa
    Maroto-Valer, M. Mercedes
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2012, 19 (04) : 1084 - 1096