共 50 条
- [41] On Protecting Fish in a Hydroelectric Power Station Power Technology and Engineering, 2022, 56 (04): : 529 - 537
- [42] New technological solutions and designs of the mechanical equipment of structures at the Rogun hydroelectric station Hydrotechnical Construction, 1988, : 114 - 119
- [44] Cretaceous stage in the evolution of the Jiamusi-Bureya fragment of the continental margin as exemplified by the Bureya and Hegang basins Russian Journal of Pacific Geology, 2015, 9 : 96 - 108
- [47] Check of the geotechnical design parameters of the dam of Reventazon Hydroelectric Project during construction stage FROM FUNDAMENTALS TO APPLICATIONS IN GEOTECHNICS, 2015, : 2473 - 2480
- [49] Seismometric Monitoring of Toktogul Hydroelectric Power Station 2012 IV INTERNATIONAL CONFERENCE PROBLEMS OF CYBERNETICS AND INFORMATICS (PCI), 2012,