共 50 条
- [31] JEDDAH SEAWATER REVERSE OSMOSIS INSTALLATION. Coating Conference, Proceedings of the Technical Association of the Pulp and Paper Industry, 1979, 30 (01): : 259 - 281
- [32] PLASTIC UTILITIES DUCT FOR UNDERGROUND INSTALLATION. American National Standards Institute, Standards, 1976,
- [33] Worldwide Standardized Plug - Problems and Rules of Installation. RGE, Revue Generale de l'Electricite, 1974, 83 (11): : 818 - 821
- [34] DESIGN AND CONSTRUCTION: A MODERN CONTINUOUS CASTING INSTALLATION. Iron and Steel Engineer, 1972, 49 (08): : 25 - 35
- [35] INTEGRATED DATA PRESENTATION/CONTROL ON DREDGING INSTALLATION. Ports and Dredging, 1987, (127): : 4 - 7
- [36] Construction and Operation of Eschenfelden Underground Storage Installation. 1978, 58 (11): : 793 - 798
- [38] ENERGY SAVING IN THE COMPRESSION SECTION OF AN ETHYLENE INSTALLATION. Xiandai Huagong/Modern Chemical Industry, 1982, (02): : 26 - 29
- [39] LOW COST ENVIRONMENTAL NOISE MONITORING INSTALLATION. Noise Control Vibration Isolation, 1979, 10 (07): : 275 - 277
- [40] Car with hybrid power installation. Experimental results Avtomobil'naya Promyshlennost, 2001, (11): : 9 - 10