共 50 条
- [21] Periodic inspection optimization model for a multi-component repairable system with failure interaction The International Journal of Advanced Manufacturing Technology, 2012, 61 : 295 - 302
- [22] Real - time Optimization of Distributed Energy Storage System Operation Strategy Based on Peak Load Shifting 2017 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION (ESMA2017), VOLS 1-4, 2018, 108
- [23] ANALYSIS OF A REPAIRABLE 2-UNIT PARALLEL REDUNDANT SYSTEM WITH FAILURE AND REPAIR TIMES ARBITRARILY DISTRIBUTED MICROELECTRONICS AND RELIABILITY, 1993, 33 (03): : 307 - 312
- [24] Availability optimization of a series system with multiple repairable load sharing subsystems considering redundancy and repair facility allocation Arabi, A.A.Y. (aya6425@gmail.com), 1600, Springer (04): : 262 - 274
- [25] ANALYSIS OF A STANDBY SYSTEM WITH RAYLEIGH DOWN TIME AND GAMMA FAILURE TIME DISTRIBUTIONS MICROELECTRONICS AND RELIABILITY, 1993, 33 (06): : 793 - 796
- [27] Optimization of the Recovery Time of Pyramid Code in Distributed Storage System 2020 3RD INTERNATIONAL CONFERENCE ON COMPUTER INFORMATION SCIENCE AND APPLICATION TECHNOLOGY (CISAT) 2020, 2020, 1634
- [28] Distributed control system time sequence optimization based on FAHP Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (09): : 2419 - 2426
- [29] TIME AND FREQUENCY-ANALYSIS OF THE BRAINS DISTRIBUTED GAMMA-BAND SYSTEM IEEE ENGINEERING IN MEDICINE AND BIOLOGY MAGAZINE, 1995, 14 (04): : 400 - 410
- [30] Adaptive optimization of solution time in a distributed multi-agent system 2005 INTERNATIONAL CONFERENCE ON INTEGRATION OF KNOWLEDGE INTENSIVE MULTI-AGENT SYSTEMS: KIMAS'05: MODELING, EXPLORATION, AND ENGINEERING, 2005, : 265 - 270