FOUNDATION TREATMENT FOR INDIA'S SALAL DAM.

被引:0
|
作者
Chadha, B.R.
机构
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:53 / 56
相关论文
共 50 条
  • [42] SEALING THE JOINTS OF THE ANDIZHAN CONCRETE DAM.
    Argal, E.S.
    Ermoshin, V.M.
    Hydrotechnical Construction, 1984, 18 (05): : 212 - 220
  • [43] INNOVATIVE RECYCLING SAVES CONDEMNED DAM.
    Tolle, James M.
    Simard, Peter W.
    Brown, Lynn A.
    World construction English ed., 1979, 32 (10): : 22 - 26
  • [44] FINAL FOUNDATION TREATMENT AT HOOVER DAM
    SIMONDS, AW
    TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1953, 118 : 78 - 99
  • [45] Comoe Dam Lateritic Foundation Treatment
    Chraibi, A. F.
    Nombre, A.
    GROUTING 2017: CASE HISTORIES, 2017, (287): : 21 - 32
  • [46] Foundation treatment at the Tadami dam site
    Anon
    International Water Power and Dam Construction, 1991, 43 (11): : 35 - 36
  • [47] SLIDE IN UPSTREAM SLOPE OF LAKE SHELBYVILLE DAM.
    Humphrey, D.N.
    Leonards, G.A.
    Journal of geotechnical engineering, 1986, 112 (05): : 564 - 577
  • [48] Design for Servicability of the Round Heads of a Buttress Dam.
    Gerber, K.-H.
    Linse, D.
    1600, (62):
  • [49] Slurry Trench for the OA-11 Dam.
    Massiera, Michel
    Pare, Jean-Jacques
    1600, (14):
  • [50] Roselend Dam. Use of an Upstream Blanket.
    Wong, B.
    Daubord, B.
    Travaux Paris, 1986, (607): : 49 - 51