共 50 条
- [5] EXPERIENCE IN RECONSTRUCTING THE RADIAL GATE OF THE SPILLWAY AT THE VILYUI HYDROELECTRIC STATION. Hydrotechnical Construction, 1984, 18 (09): : 414 - 418
- [7] Thermal Protection of Soil Base at Construction Site of the Vilyui-III Hydroelectric Plant Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo), 30 (10):
- [8] New Stage in the Construction of the Bureya Hydroelectric Station Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo), 29 (12):
- [10] Chirkey Hydroelectric Station: Design, Construction, Operation Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo), 1997, 31 (08):