共 50 条
- [4] MODIFICATION OF TURBINE RUNNER BLADES AT THE CHIRKEY HYDROELECTRIC STATION. Hydrotechnical Construction, 1987, 21 (01): : 42 - 45
- [5] Optimization of the distribution of the load among units of the Chirkey hydroelectric station Hydrotechnical Construction, 1989, 22 (07): : 420 - 426
- [8] Construction of the Vilyui-3 Hydroelectric Station Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo), 31 (08):
- [9] New Stage in the Construction of the Bureya Hydroelectric Station Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo), 29 (12):