Vibrational Diagnostics of the Place of Disbalance of the GT-750-6 Gas Turbine Plant.

被引:0
|
作者
Beskletnyi, M.E.
Igumentsov, E.A.
机构
来源
Energomashinostroenie | 1980年 / 04期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:27 / 29
相关论文
共 50 条
  • [41] Changes in the Structure and Properties of Metal of Blades Made of EI893 Alloy During Operation in a Combined Steam and Gas Turbine Power Plant.
    Klypina, A.M.
    Kirichenko, E.P.
    Melamed, M.M.
    Chistyakova, L.D.
    Kuznetsova, T.P.
    Shcheklanova, Z.P.
    1600,
  • [42] TESTS ON A UNIT OF AFTERBURNERS OF THE GT-25-700 GAS-TURBINE PLANT AT YAKUTSK-CENTRAL-POWER-STATION
    AKULOV, VA
    BUTOVSKII, LS
    ZHEMCHUGOV, VI
    ZMAILOV, VA
    TUMANOVSKII, AG
    FIVEISKII, VY
    KHRISTICH, VA
    CHERNIN, EI
    SHUBNYAKOV, IK
    THERMAL ENGINEERING, 1981, 28 (06) : 342 - 345
  • [43] Thermodynamics of GT-MHR-250 modular nuclear plant with helium reactor and gas turbine based on the complex Brayton cycle
    Wang, Dongyun
    Khalatov, Artem
    Shi-Ju, E.
    Donyk, Tetyana
    Shikhabutinova, Oksana
    THERMAL SCIENCE AND ENGINEERING PROGRESS, 2023, 39
  • [44] A DIRECT-CYCLE GAS-TURBINE POWER-PLANT FOR NEAR-TERM APPLICATION - MGR-GT
    LIDSKY, LM
    LANNING, DD
    STAUDT, JE
    YAN, XL
    KABURAKI, H
    MORI, M
    ENERGY, 1991, 16 (1-2) : 177 - 186
  • [45] Selection of Optimal Conditions of Operation of GT-100-750-2 Gas Turbine Plants at No. 3 District Power Station of Moscow Energy System.
    Kostrova, T.A.
    Dlugosel'skii, V.I.
    Gribov, V.B.
    Serebryannikov, N.I.
    Kuznetsov, E.K.
    Ptitsyn, G.V.
    Teploenergetika, 1981, (06): : 44 - 47
  • [46] The finite-time exergoeconomic performance of a real, intercooled, regenerated gas-turbine cogeneration plant. Part 1: model description and parametric analyses
    Chen, Lingen
    Yang, Bo
    Ge, Yanlin
    Sun, Fengrui
    INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2014, 9 (01) : 29 - 37
  • [47] THE NUCLEAR CLOSED-CYCLE GAS-TURBINE (HTGR-GT) - DRY COOLED COMMERCIAL POWER-PLANT STUDIES
    MCDONALD, CF
    BOLAND, CR
    JOURNAL OF ENGINEERING FOR POWER-TRANSACTIONS OF THE ASME, 1981, 103 (01): : 89 - 100
  • [48] Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine
    Anisimov A.G.
    Klub M.V.
    Sargsyan K.B.
    Eritsyan S.K.
    Petrosyan G.S.
    Avtandilyan A.V.
    Gevorgyan A.R.
    Power Technology and Engineering, 2016, 49 (5) : 359 - 364
  • [49] Numerical analysis of aerodynamics and hydraulic loss in the GTÉ-150 combustion chamber of gas-turbine power plant with the use of the fluent suite
    Lysenko D.A.
    Solomatnikov A.A.
    Journal of Engineering Physics and Thermophysics, 2006, 79 (4) : 673 - 677
  • [50] Finite-time exergoeconomic performance of a real intercooled regenerated gas turbine cogeneration plant. Part 2: heat conductance distribution and pressure ratio optimization
    Yang, Bo
    Chen, Lingen
    Ge, Yanlin
    Sun, Fengrui
    INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2014, 9 (04) : 262 - 267