Discussion and implementation of CAD development for the steam and water system in a boiler plant

被引:0
|
作者
Yu, Guoqing
Dong, Shan
Guo, Jun
机构
来源
Nuantong Kongtiao/HV & AC | 2000年 / 30卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:61 / 63
相关论文
共 50 条
  • [21] Development line in steam boiler construction
    Paul, H
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1944, 88 : 89 - 99
  • [22] Stages in the development of steam generator technology From "norm boiler" to gigawatt-plant
    Titzmann, Annette
    BWK, 2009, 61 (7-8): : 58 - 63
  • [23] A SYSTEM FOR CAD CAM SOFTWARE-DEVELOPMENT AND IMPLEMENTATION
    TAMM, B
    KYTTNER, R
    VILIPYLD, J
    PRUUDEN, J
    COMPUTERS IN INDUSTRY, 1984, 5 (04) : 367 - 376
  • [24] Parametric Identification of the Reheater of a Power-Plant Boiler in the System That Controls Steam Temperature
    S. S. Kuznetsov
    E. A. Ryzhkova
    Fibre Chemistry, 2015, 46 : 330 - 335
  • [25] Parametric Identification of the Reheater of a Power-Plant Boiler in the System That Controls Steam Temperature
    Kuznetsov, S. S.
    Ryzhkova, E. A.
    FIBRE CHEMISTRY, 2015, 46 (05) : 330 - 335
  • [26] PRODUCTION CAD IMPLEMENTATION FOR WATER AND WASTE-WATER TREATMENT-PLANT DESIGN
    GLASER, HT
    HOWE, KJ
    WARREN, GL
    WATERCOMP 89: THE FIRST AUSTRALASIAN CONFERENCE ON TECHNICAL COMPUTING IN THE WATER INDUSTRY, 1989, : 7 - 12
  • [27] Boiler steam sampling and water analysis system - A major cost effective effort by electric utilities, to assure reliable and efficient steam generation with extended plant life
    Mookerjee, G
    Les, JG
    PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL. 60, PTS I & II, 1998, : 998 - 1003
  • [28] Selection and analysis of material for boiler pipes in a steam plant
    Lazic, Vukic
    Arsic, Dusan
    Nikolic, Ruzica R.
    Rakic, Dragan
    Aleksandrovic, Srbislav
    Djordjevic, Milan
    Hadzima, Branislav
    INTERNATIONAL CONFERENCE ON MANUFACTURING ENGINEERING AND MATERIALS, ICMEM 2016, 2016, 149 : 216 - 223
  • [29] Steam boiler explosions in an electrical plant in Abo.
    Klein, M
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1921, 65 : 266 - 267
  • [30] Boiler plant replacement reduces steam costs 35%
    Fiorino, DF
    ASHRAE JOURNAL, 1999, 41 (09) : 57 - 59