CAMPUS CENTRAL CHILLED WATER PLANT PLAN: 1.

被引:0
|
作者
Swinson, Steve [1 ]
Hofmann, George J. [1 ]
Bahnfleth, Donald R. [1 ]
机构
[1] Auburn Univ, Auburn, AL, USA, Auburn Univ, Auburn, AL, USA
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:51 / 55
相关论文
共 50 条
  • [21] Chilled water plant saving at no cost
    Reed, Michael A.
    Davis, Cedreck
    Energy Engineering: Journal of the Association of Energy Engineering, 2008, 105 (02): : 59 - 76
  • [22] Understanding chilled water plant performance
    Ricart, Kevin
    Andreone, Kevin
    Dabhi, Vidit
    Consulting-Specifying Engineer, 2021, 58 (06) : 18 - 23
  • [23] Control strategy of variable flow between cooling water and chilled water in chilled plant
    Jiang, Xiao-Qiang
    Long, Wei-Ding
    Li, Min
    Chongqing Daxue Xuebao/Journal of Chongqing University, 2010, 33 (06): : 6 - 12
  • [24] Pressure Control Issue With TES on Large Campus Chilled Water Loop
    Chen, Hui
    Chen, Amy
    Hahn, Wyatt
    Riley, James
    Williams, Les
    Henry, Robert
    ASHRAE JOURNAL, 2018, 60 (03) : 68 - 73
  • [25] Improving Efficiency in a Campus Chilled Water System Using Exergy Analysis
    Harrell, Justin M.
    Mathias, James A.
    ASHRAE TRANSACTIONS 2009, VOL 115, PT 1, 2009, 115 : 507 - 522
  • [26] Optimal supervisory control of a central chilled water plant with heuristic search sequential quadratic programming
    Sun, Jian
    ENGINEERING OPTIMIZATION, 2010, 42 (09) : 863 - 885
  • [27] SIMULATING CENTRAL CHILLED WATER-SYSTEMS
    不详
    ASHRAE JOURNAL-AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS, 1980, 22 (10): : 71 - 71
  • [28] Tips to Reduce Chilled Water Plant Costs
    Taylor, Steven T.
    ASHRAE JOURNAL, 2013, 55 (10) : 48 - +
  • [29] Central chilled water distribution systems design
    ASHRAE J, 2009, 4 (33-40):
  • [30] Chilled water plant retrofit - A case study
    Taylor, Steven T.
    ASHRAE Transactions 2006, Vol 112, Pt 2, 2006, 112 : 187 - 197