共 50 条
- [41] Stress corrosion cracking of steam generator of nuclear power plant CASE HISTORIES ON INTEGRITY AND FAILURES IN INDUSTRY, 1999, : 179 - 186
- [42] Chemical steam generator cleaning at Unterweser Nuclear Power Plant VGB Kraftwerkstechnik, 1995, 75 (09):
- [44] Steam generator replacement project at TVA's Sequoyah Unit 1 Nuclear Power Plant PROCEEDINGS OF 2004 ASME POWER, 2004, : 35 - 40
- [45] Soft Constrained MPC on Water Level Control in Steam Generator of a Nuclear Power Plant Zidonghua Xuebao/Acta Automatica Sinica, 2019, 45 (06): : 1111 - 1121
- [46] Performance Assessment for the Water Level Control System in Steam Generator of the Nuclear Power Plant 2011 30TH CHINESE CONTROL CONFERENCE (CCC), 2011, : 5842 - 5847
- [48] Dynamic model of nuclear power plant steam turbine ARCHIVES OF CONTROL SCIENCES, 2015, 25 (01): : 65 - 86
- [49] Test and study of cold condition for dryer in steam generator for 1000 MW PWR nuclear power plant Hedongli Gongcheng, 2006, 2 (72-77):