OPTIMIZING A DESIGN FOR PRODUCTION, INSPECTION, AND OPERATION.

被引:0
|
作者
Corser, T. [1 ]
Seireg, Ali A. [1 ]
机构
[1] Univ of Wisconsin, Mechanical, Engineering Dep, Madison, WI, USA, Univ of Wisconsin, Mechanical Engineering Dep, Madison, WI, USA
来源
关键词
DESIGN COSTS - INSPECTION COSTS - MANUFACTURING COSTS;
D O I
暂无
中图分类号
学科分类号
摘要
(Edited Abstract)
引用
收藏
页码:18 / 27
相关论文
共 50 条
  • [11] The shockless operation.
    Lockhart-Mummery, P
    LANCET, 1916, 2 : 249 - 249
  • [12] DESIGN OF STEAM TURBINES FOR TWO-SHIFT OPERATION.
    Bertilsson, J.E.
    Berg, U.
    1600, (71): : 3 - 4
  • [13] POWERPLANT DESIGN FOR ONE-ENGINE-INOPERATIVE OPERATION.
    Hirschkron, Robert
    Martin, Eugene
    Samanich, Nick
    Vertiflite, 1984, 30 (05): : 34 - 38
  • [14] A Novel Design Concept of a PMSM For Flux Weakening Operation.
    Yu, J.
    Li, L.
    Cao, J.
    2015 IEEE MAGNETICS CONFERENCE (INTERMAG), 2015,
  • [15] HYDRODYNAMIC DESIGN OF A FULL SHIP FOR SHALLOW WATER OPERATION.
    Miyazawa, Masaru
    Nagamatsu, Tetsuo
    Hoshino, Tetsuji
    Technical Review - Mitsubishi Heavy Industries, 1986, 23 (03): : 280 - 286
  • [16] Simplified operation.
    不详
    MODERN PLASTICS, 1996, 73 (05): : 112 - 112
  • [17] The Bottini operation.
    Freudenbeig, A
    DEUTSCHE MEDIZINISCHE WOCHENSCHRIFT, 1902, 28 : 925 - 927
  • [18] The shockless operation.
    Fergusson, WM
    LANCET, 1916, 2 : 122 - 122
  • [19] Reservoir Operation.
    Miquel, J.
    Roche, P.A.
    Houille Blanche, 1986, 41 (06): : 409 - 425
  • [20] The shockless operation.
    Lockhart-Mummery, P
    LANCET, 1916, 2 : 12 - 13