共 50 条
- [21] Calculation of Thermal River Conditions in the Tail Water of Hydroelectric Power Plants. Izvestia Sibirskogo otdelenia Akademii nauk SSSR. Seria tehniceskih nauk, 1983, (03):
- [22] Governor Control Systems in Hydroelectric Power Plants: Overview, Challenges, and Recommendations 2023 11TH INTERNATIONAL CONFERENCE ON SMART GRID, ICSMARTGRID, 2023,
- [23] BENEFITS ANALYSIS FOR CONTROL UPGRADE PROJECTS IN EXISTING PLANTS. CEA, Chemical Engineering in Australia, 1987, 12 (02): : 13 - 24
- [24] Ways of Raising Welded Units Reliability in Power Plants. Energomashinostroenie, 1975, (12): : 16 - 18
- [25] CONTROL AND ISOLATION DAMPERS FOR POWER PLANTS. Power Engineering (Barrington, Illinois), 1981, 85 (04): : 87 - 90
- [26] UTILIZATION OF MULTIPLEXING TECHNIQUES FOR EXISTING TVA FOSSIL POWER PLANTS. American Society of Mechanical Engineers, Applied Mechanics Division, AMD, 1980,
- [27] INSTRUMENTATION AND CONTROL SYSTEMS FOR CANDU-PHW NUCLEAR POWER PLANTS. Atomic Energy of Canada Limited, AECL (Report), 1982,
- [28] AUTOMATIC SYSTEMS FOR HYDROELECTRIC POWER-PLANTS BROWN BOVERI REVIEW, 1979, 66 (07): : 502 - 508
- [29] AUTOMATION SYSTEMS FOR HYDROELECTRIC POWER-PLANTS BROWN BOVERI REVIEW, 1980, 67 (01): : 26 - 27
- [30] CONTROL SYSTEMS IN COAL PREPARATION PLANTS. Electric Power Research Institute, Coal Combustion Systems Division, (Report) EPRI CS, 1981, (1880):