'SLIDING ARMOUR' SHIELD SOLVES KURIYAMA TRAFFIC PROBLEMS.

被引:0
|
作者
Harding, Piers G.
机构
来源
Tunnels and Tunnelling International | 1981年 / 13卷 / 05期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The article describes a tunneling project that took place under a busy railway line with only 20cm of cover and strict orders not to interrupt train services. It reports on how a Japanese contractor solved the problem using augered steel pipes for overhead support and a blade shield for excavation.
引用
收藏
页码:44 / 45
相关论文
共 49 条
  • [21] STATPIPE LANDFALL APPROACH SOLVES ROCKY SHORE PROBLEMS.
    Lund, Sverre
    Gjertveit, Erling
    Oil and Gas Journal, 1986, 84 (19): : 67 - 68
  • [22] AMOCO SOLVES UNIQUE HIGH ISLAND COMPLETION PROBLEMS.
    Moore, Steven D.
    Petroleum Engineer International, 1981, 53 (14): : 12 - 14
  • [23] RECENT BREAKER BREAKTHROUGH SOLVES BEVY OF OLD PROBLEMS.
    Maier, Alfred E.
    Shimp, Alan B.
    Actual Specifying Engineer, 1973, 30 (01): : 93 - 98
  • [24] COATED STUCCO SOLVES CERAMIC SHELL DRYING PROBLEMS.
    Schwartz, Carl H.
    Modern Casting, 1987, 77 (06) : 31 - 33
  • [25] IMPROVED SILO DESIGN SOLVES COAL DISCHARGE PROBLEMS.
    Williams, Richard L.
    Johnston, F.Thomas
    Coal age, 1986, 21 (01): : 57 - 59
  • [26] CERAMIC WELDING SOLVES TEMPORARY FURNACE REPAIR PROBLEMS.
    Anon
    Glass Industry, 1988, 69 (02): : 21 - 22
  • [27] T-TAP SWITCH SOLVES A VARIETY OF URD PROBLEMS.
    Peterson, Roger K.
    Westinghouse Engineer, 1972, 32 (06): : 182 - 187
  • [28] BARE MACHINE ADA SOLVES REAL-TIME PROBLEMS.
    Seymour, Burch
    Electronic Systems Technology and Design/Computer Design's, 1988, 27 (05): : 58 - 62
  • [29] SHELL SOLVES DEEPWATER PIPE LINE TIE-IN PROBLEMS.
    Swank, J.C.
    Pipe line industry Houston, Tex., 1980, 52 (01): : 55 - 58
  • [30] NEW DEGASSER/DESURGER DESIGN SOLVES GAS SEPARATION PROBLEMS.
    Hertz, Darryl W.
    SPE Production Engineering, 1987, 2 (01): : 51 - 56