NEW TECHNOLOGY REQUIRED FOR WEST GERMAN SULFUR LINE.

被引:0
|
作者
Lechler, Siegfried
Misra, Ashok
Feizlmayr, Adolf
机构
来源
| 1978年 / 48卷 / 06期
关键词
SULFUR; -; Transportation;
D O I
暂无
中图分类号
学科分类号
摘要
Designed to carry liquid sulfur at 314 degree F, the 4. 4-mile line described is equipped with electrical heat tracing cables, thermal insulation and thermal expansion sections.
引用
收藏
页码:55 / 58
相关论文
共 50 条
  • [21] CONSTRUCTION OF NEW GENERAL CONTROL SYSTEM IN TOKAIDO SHINKANSEN LINE.
    Kato, Shin ichiro
    Japanese Railway Engineering, 1988, 27 (04): : 8 - 10
  • [22] DESIGN AND CONTROL OF INLAND'S NEW CONTINUOUS ANNEALING LINE.
    Gaskey, Kenneth M.
    Crosby, Dennis T.
    Hoffman, Victor R.
    1600, (62):
  • [23] Effect of SCFA on lipogenesis in a new human hepatocyte cell line.
    Reimer, R
    Pfeifer, A
    Mace, K
    FASEB JOURNAL, 1999, 13 (05): : A926 - A926
  • [24] New Tunnel ″San Bernardino″ on the Genoa-Ventimiglia Line.
    Piepoli, Gaetano
    Ingegneria Ferroviaria, 1976, (10): : 3 - 12
  • [25] DESIGN, CONSTRUCTION FEATURES ON GAS DEL ESTADO'S NEW LINE.
    Di Minico, F.
    Pipe line industry Houston, Tex., 1987, 67 (05): : 53 - 54
  • [26] NEW PRINCIPLES IN THE POLYMERIC SULFUR TECHNOLOGY
    Yavorsky, Victor
    CHEMISTRY & CHEMICAL TECHNOLOGY, 2008, 2 (02): : 129 - 131
  • [27] Complex Autonomous System Assisting a Manufacturing Technology on a Mechatronics Line. A Digital Twin Approach
    Filipescu, Adrian
    Solea, Razvan
    Cernega, Daniela Cristina
    Ionescu, Dan
    Simion, Georgian
    Filipescu, Adriana
    2022 26TH INTERNATIONAL CONFERENCE ON SYSTEM THEORY, CONTROL AND COMPUTING (ICSTCC), 2022, : 157 - 162
  • [28] NEW WEST-GERMAN PLANETARIUM
    KELLER, HU
    SKY AND TELESCOPE, 1977, 54 (05): : 375 - 377
  • [29] NEW WEST GERMAN GAS ANALYZERS
    SEVASTYANOVA, LI
    INDUSTRIAL LABORATORY, 1961, 27 (02): : 232 - 236
  • [30] TECHNOLOGY AND CULTURE IN WEST GERMAN BOURGEOIS CULTURAL SOCIOLOGY
    ULLE, D
    DEUTSCHE ZEITSCHRIFT FUR PHILOSOPHIE, 1968, 16 (01): : 74 - 89