共 50 条
- [42] Failures in a Proton Pump Inhibitor Therapeutic Substitution Program: Lessons Learned Digestive Diseases and Sciences, 2007, 52 : 2813 - 2820
- [44] Lessons Learned from Recent Failures of Structural Timber Appurtenant Assemblies FORENSIC ENGINEERING 2018: FORGING FORENSIC FRONTIERS, 2018, : 914 - 929
- [46] The InfoPad project: Review and lessons learned ELEVENTH INTERNATIONAL CONFERENCE ON VLSI DESIGN, PROCEEDINGS, 1997, : 2 - 3
- [47] In-Depth Lessons Learned: Review of an Avionics Thermal Analysis Project 2014 30TH ANNUAL SEMICONDUCTOR THERMAL MEASUREMENT AND MANAGEMENT SYMPOSIUM (SEMI-THERM), 2014, : 125 - 132
- [48] Risk analysis of the vertical offshore breakwater at Gela, Italy PROCEEDINGS OF THE SEVENTH (1997) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL IV, 1997, 1997, : 153 - 159
- [50] Vertical flight lessons learned from operation desert storm 1600, Publ by American Helicopter Soc, Alexandria, VA, USA (37):