共 50 条
- [31] MATCHING PUMPS TO SYSTEM REQUIREMENTS. Plant Engineering (Barrington, Illinois), 1975, 29 (21): : 162 - 165
- [32] Oil-Poor Medium-Voltage Power Switches Fulfill the Increased Requirements. Elektrizitatswirtschaft, 1985, 84 (04): : 132 - 135
- [34] IMPACT RIPPLING - NCB EXPERIENCE AND REQUIREMENTS. Massachusetts Institute of Technology, School of Engineering, Department of Civil Engineering, Ralph M. Parsons Laboratory for Water Resources and Hydrodynamics, Report, 1974,
- [36] STEERING GEAR: NEW CONCEPTS AND REQUIREMENTS. Transactions - Institute of Marine Engineers, (Series) TM, 1982, 94
- [37] TRACK REHABILITATION AND MAINTENANCE RESEARCH REQUIREMENTS. United States Federal Railroad Administration, Report, 1980,