共 50 条
- [31] AUTOMATIC START-UP AND SHUT-DOWN OF A 3,5 MW INDUSTRIAL TURBINE IN HEATING AND POWER PLANT PFAFFENWALD PAPIER, 1967, 21 (10A): : 713 - &
- [34] Numerical Study of Flow Characteristic and Heat Transfer on High-Pressure Turbine Forced Cooling Process of Sub Critical Steam Turbine INNOVATIVE SCIENCE AND TECHNOLOGY IN MECHANICAL ENGINEERING FOR INDUSTRY 4.0, 2019, 2187
- [36] Case study of surge avoidance design for centrifugal compressor systems during emergency shut-down (ESD) Korean Journal of Chemical Engineering, 2016, 33 : 764 - 774
- [37] RESULTS OF AN INVESTIGATION INTO START-UP AND SHUT-DOWN OPERATION OF CENTRAL POWER-STATION UNIT STEAM-GENERATORS IN BULGARIA ENERGIETECHNIK, 1977, 27 (09): : 347 - 353
- [39] Temporary CO2 capture shut down: Implications on low pressure steam turbine design and efficiency 7TH TRONDHEIM CONFERENCE ON CO2 CAPTURE, TRANSPORT AND STORAGE (2013), 2014, 51 : 14 - 23
- [40] STXM Characterization of Nanostructured Thin Film Anode Before and After Start-up Shut-down and Reversal Tests POLYMER ELECTROLYTE FUEL CELLS 13 (PEFC 13), 2013, 58 (01): : 473 - 479