共 50 条
- [21] Safety threshold of high-speed railway pier settlement based on train-track-bridge dynamic interaction Science China Technological Sciences, 2015, 58 : 202 - 210
- [25] Railway track stiffness measurements at bridge transition zones ADVANCES IN TRANSPORTATION GEOTECHNICS II, 2012, : 811 - 816
- [27] Global Instrumentation, Vehicle, Track and Bridge on operation railway of MRS Logistic Railway MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 1731 - 1737
- [28] Effect of track defects on track deformations for high-speed railway bridge STEEL AND COMPOSITE STRUCTURES, 2021, 41 (03): : 447 - 459
- [29] Experimental Study on Settlement of Backfill in Integral Bridge Abutments Induced by Seasonal Temperature Changes IFCEE 2021: EARTH RETENTION, GROUND IMPROVEMENT, AND SEEPAGE CONTROL, 2021, 324 : 12 - 22
- [30] Experimental study on settlement of backfill in integral bridge abutments induced by seasonal temperature changes Geotech Spec Publ, 1600, GSP 324 (12-22):